7
Before the installation, wash the all system pipes must be washed
carefully for removing any residual things that can give damage to
operation of the device.
When heating system increases over 3 bar, water disposal starts from
safety valve.
Device installation place must be far way from blockers, obstruction parts
and bulges during repairing and maintenance. There must be sufficient
space around the device for maintenance and repair.
Electric connection of the device must be made with suitable cable, fuse
and residual current device and grounding absolutely must be made.
Installation wall of the device must be as durable as carrying the weight of
the device.
5.2. Wall Installation Of Device
Drill installation holes to chosen place according to conditions stated above and
fasten fixing plugs. Control durability of device by screw on to holes from up and
down.
5.2.1. Connection of Heating System and Water Installation
Heating system must be drawn with suitable diameter pipe for providing enough
circulation of heating water. Choosing radiator pipes smaller than it is needed,
fitting constriction or blockage can cause inability circulation of heating.
Connections that are made to device must be easy removable when it is needed.
There must be separate cutoff valve at radiator inlet and outler of device also there
must be silt trap between valve line and device. There must be valve and silt trap at
cold water inlet.
Make sure that installation wall can carry device weight and installation part
is fixed as safely