background image

LTE EnviroMonitor

® 

Replacement Kit

Product Number 6882 

Document Number: 07395.376 Rev.B  7/7/20

EnviroMonitor

®

, Vantage Pro

®

, Vantage Pro2

, and WeatherLink

®

 are trademarks of Davis Instruments 

Corp., Hayward, CA. 

© Davis Instruments Corp. 2020. All rights reserved. 
Information in this document subject to change without notice. Davis Instruments Quality Management
System is ISO 9001 certified. 

3465 Diablo Avenue, Hayward, CA 94545-2778 U.S.A.

510-732-9229 • Fax: 510-732-9188

® 

[email protected]  •  www.davisinstruments.com

Connect and Remount your Gateway

Now you are ready to connect and remount your Gateway and add Nodes as 
desired. For instructions on how to do this, please refer to the EnviroMonitor 
Gateway and Node User Guide. It can be found in the support section of 
www.davisinstruments.com.

Contacting Davis Technical Support

For questions about installing or operating your EnviroMonitor Gateway,
please contact Davis Technical Support. We’ll be glad to help.

Online

www.davisinstruments.com

See the Weather Support section for copies of user 
manuals, product specifications, application notes, 
software updates, and more. 

E-mail

[email protected]

Telephone

(510) 732-7814 
Monday - Friday, 7:00 a.m. - 5:30 p.m. Pacific Time. 

Summary of Contents for EnviroMonitor

Page 1: ...duct number 6682 USER MANUAL Davis Instruments 3465 Diablo Avenue Hayward CA 94545 2778 U S A 510 732 9229 www davisinstruments com R LTE Replacement Board Kit for EnviroMonitor Gateway and Vantage Connect ...

Page 2: ......

Page 3: ... is a sticker for the plastic cover with the new Device ID as well as troubleshooting stickers for inside the door of your shelter The hardware kit includes 3 4 x 3 8 screws for attaching the board to the shelter and 2 6 X 1 2 screws to secure the cover Note Please handle the board and antennas with care especially the connection between the cellular antennas and the board The connections allows f...

Page 4: ...e three screws holding the plastic cover over the board and remove the cover Unscrew the two screws securing the cellular antenna 4 Using a small Phillips head screwdriver unscrew the two screws securing the board 5 Lift out the board and antennas 6 Install the new board See page 4 Install the LTE Replacement Board Old cell modem antenna Cover Old weather receiver antenna Main power jack Main powe...

Page 5: ...ews holding the plastic cover over the board and remove the cover Unscrew the two screws securing the cellular antenna 4 Using a small Phillips head screwdriver unscrew the three screws securing the board 5 Lift out the board and antennas 6 Install the new board See page 4 Install the LTE Replacement Board Main Power Cable Main Power Jack Remove screws Old Mesh Antenna Old Cellular Antenna Cover R...

Page 6: ...e board 3 Install the new cover Make sure the new mesh antenna cable exits through the opening on the right hand side of the cover and the new cellular antennas cables exit through one of the openings on the left side of the cover Attach the cover using the two 6 x 1 2 screws 4 Put the new black label with the new DID on the cover Tip Make a note of the new Device ID DID Use these holes 3 4 X 3 8 ...

Page 7: ...y that will be upgraded 3 Tap the Menu icon in the upper right corner Scroll down to the Replace button 4 Follow the prompts to complete the process Old Vantage Connect to LTE EnviroMonitor Gateway 1 Open the EnviroMonitor app on your smart phone 2 Follow the prompts to set up your EnviroMonitor Gateway You will now have two stations on WeatherLink com your old Vantage Connect with all its data an...

Page 8: ... Connect and Remount your Gateway Now you are ready to connect and remount your Gateway and add Nodes as desired For instructions on how to do this please refer to the EnviroMonitor Gateway and Node User Guide It can be found in the support section of www davisinstruments com Contacting Davis Technical Support For questions about installing or operating your EnviroMonitor Gateway please contact Da...

Reviews: