11
This installation uses a pump to create flow in the Cell bypass. Note the recommended sample line and optional clear
viewing pipe. Please also note that care must be taken at the suction point to avoid air entering the bypass.
IMPORTANT:
The Bypass Pump must be electrically interlocked to the main pool pump(s). Further to this, a
Pressure Switch should be installed in the return line prior to the Cell Installation so that main pump(s) failure can be
detected and Chlorinator production turned off. See “Gas Sensor and Pressure Switch Installation”.