10
The off-take should be after the cell, in the return line to avoid the possibility of air in the return line finding its way into the
cell (see diagram page 7). The installation of a section of clear pipe before or after the Gas Sensor is be neficial in
viewing water flow from the cell. This pipe must be suitable for chlorinated water.
Powered Bypass Installation: (If required to maintain flow through cell)