USER
’
S MANUAL
4
PACKING, TRANSPORT AND STORAGE
ALL PACKING, LIFTING, HANDLING, TRANSPORT AND UNPACKING OPERATIONS
ARE TO BE PERFORMED EXCLUSIVELY BY EXPERT PERSONNEL
Packing dimension picture
Transport
Packing can be lifted or moved by lift trucks, cranes or bridge cranes. In case of slinging,
a second person must always take care of the load, in order to avoid dangerous
oscillations
.
During loading and unloading operation, goods must be handled by vehicles or ships.
At the arrival of the goods, verify that all items specified in the delivery notes are included. If finding
missing parts, possible defects or damage due to transport, one should examine damaged cartons according
to “Packing List” to verify the
condition of damaged goods and missing parts, also the person in charge or
the carrier must be immediately informed.
The machine is heavy goods! Don’t take manpower load and unload and transporting way into
consideration, the safety of working is important.
Furthermore, during loading and unloading operation goods must be handled as shown in the picture.
(Picture 2)
Storage:
-The machine equipment should be stocked in the warehouse, if stocked outside should do the disposal well
of waterproof.
-Use box truck in the process of transport, use container storage when shipping.
-The control box should be placed perpendicularly during the transport; and prevent other goods from
extrusion.
-The temperature for machine storage: -25ºC-- 55ºC
Picture 1 (packing dimension)
Picture 2
(
Goods-lifted
)
Summary of Contents for LJS6035
Page 1: ...USER S MANUAL 1 Small scissor Lift LJS6035 USER S MANUAL Manufacturer ...
Page 25: ...USER S MANUAL 25 Oil pipe connection diagram Explosion diagram ...
Page 26: ...USER S MANUAL 26 Hydraulic cylinder explosion diagram Explosion drawing of control box ...
Page 27: ...USER S MANUAL 27 Appendix Circuit diagram 380V ...
Page 28: ...USER S MANUAL 28 Appendix Circuit diagram 220V ...