The steps required to prepare the unit for operation include:
•
Select a location
•
Mount the controller to the machine (hardware provided)
•
Attach controller grounding wire.
•
Connect main communication cable to the controller
•
Connect unit to power source
•
Connect to cold water supply and gravity drain
•
Beaker installation
System Location
The Ahiba IR Pro should be placed on a stable, level table.
The table should have sufficient height to allow for easy
opening and closing of the door, and easy viewing of the
controller.