![DARLEY ZSP Nstallation, Operation, Maintenance, Repair And Troubleshooting Instructions Download Page 9](http://html1.mh-extra.com/html/darley/zsp/zsp_nstallation-operation-maintenance-repair-and-troubleshooting-instructions_510501009.webp)
Pump Division
1051 Palmer St.
Chippewa Falls, WI 54729
715-726-2650
Notice:
The
information
presented
in
this
technical
bulletin
was
current
as
of
the
date
listed:
2/25/16
W.S.
Darley
&
Co.
reserves
the
right
to
update,
change,
or
eliminate,
this
bulletin
at
any
time.
Technical Bulletin on PTO Mounted Fire Pump Drivelines
1202520
FEB, 25 2016
Great care must be taken in the layout of pump drivelines. Interference and driveline
vibration must be considered. An experienced installer with knowledge of driveline
considerations, proper layout and recommended guidelines should be utilized as well as
proper CAD systems for driveline layouts. Installation of the driveline should not occur until
a proper analysis is performed by either a qualified driveline specialist or W.S.
Darley. W.S. Darley utilizes, can distribute and can train qualified individuals to use the
Allison Multiple Joint Driveline Analysis program.
W.S. Darley requires that Power Take Off (PTO) driven pumps have at most 500 radians
per second
2
torsional vibration and at most 1000 radians per second
2
inertial drive torsional
vibration, as calculated by the Allison Multiple Joint Driveline Analysis program, for a
completed driveline installation. A completed driveline installation includes the entire multi-
driveshaft assembly from the power source of the PTO output flange to the input flange of
the PTO driven pump.
Failure to design and analyze a proper driveline layout could result in severe injury and
damage to equipment, including but not limited to: the water pump, the water pump
transmission, drive tubes, hanger bearings, u-joint crosses, gears, the rear differential, and
the main truck transmission.
Questions can also be directed to our Customer Service Department at
800-634-7812 or 715-726-2650.
Summary of Contents for ZSP
Page 64: ......
Page 66: ......
Page 67: ...DRIVELINE INSTALLATION J3311 1 DSSP AUGUST 2008 Supersedes J3311 1 HVTSS Dated February 2005 ...
Page 89: ......
Page 130: ......
Page 133: ......
Page 135: ...7 31 1200503 ...
Page 136: ...7 32 1200503 ...
Page 139: ...7 35 1200503 ...
Page 140: ...7 36 1201002 ...
Page 142: ...7 66 ...
Page 143: ...7 65 ...
Page 144: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......