![DARLEY ZSP Nstallation, Operation, Maintenance, Repair And Troubleshooting Instructions Download Page 83](http://html1.mh-extra.com/html/darley/zsp/zsp_nstallation-operation-maintenance-repair-and-troubleshooting-instructions_510501083.webp)
14
Installation Techniques
Multiple Shaft
Installations
If there is an offset in the installation of the axle, make sure it does not create too large of a compound universal joint operating
angle. Whenever possible, mount the axle directly in line with the first coupling shaft (when viewed from the top).
Check the actual universal joint operating angle at the rear of the first coupling shaft. If it is less than 1º and the transmission
universal joint operating angle is greater than 1.5º, rotate the end yoke at the center bearing position so that the ears of the yoke
are 90º to the ears of the tube yoke on the transmission end of the coupling shaft. (See Fig. 10) As an alternative, rotate the slip
yoke on the driveshaft 90º if the slip spline has 16 teeth.
Figure 9
Figure 10
True angle
1 to 1-1/2
Center
Bearing
These angles will
automatically be equal
Adjust the axle to be
on the same angle
as the first shaft
o
o
Rotate
Yoke
On same angle
If this angle is
less than 1 , rotate yoke
as shown
o
Summary of Contents for ZSP
Page 64: ......
Page 66: ......
Page 67: ...DRIVELINE INSTALLATION J3311 1 DSSP AUGUST 2008 Supersedes J3311 1 HVTSS Dated February 2005 ...
Page 89: ......
Page 130: ......
Page 133: ......
Page 135: ...7 31 1200503 ...
Page 136: ...7 32 1200503 ...
Page 139: ...7 35 1200503 ...
Page 140: ...7 36 1201002 ...
Page 142: ...7 66 ...
Page 143: ...7 65 ...
Page 144: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......