background image

2. Install new 

wax ring

 (not included) on the bot-

tom  of  the  toilet  (

A

)  making  sure  not  to  cover 

the  toilet  outlet.  (Alternate  Method: 

The  wax 

ring 

may also be placed onto the floor flange.)

                                                     

3. Install the new 

floor mounting bolts

 (not in-

cluded) upright in the slots of the floor flange.  
Place the toilet (

A

)

 

over the floor flange/ waste 

line  opening  by  aligning  the 

floor  mounting 

bolts

  in  the  toilet  floor  bolt  holes.  Press  down 

firmly and twist toilet  slightly to compress 

wax 

ring

 and assure a seal between the toilet (

A

) and 

floor.

4.  Place  one 

floor  mounting  bolt  washer

  (not 

included) over each 

floor mounting bolt 

and as-

semble the 

floor mounting bolt nut 

to the 

floor 

mounting bolt

. Tighten floor mounting bolt nut 

carefully until the 

floor mounting bolt nut

 is just 

snug.   

5. Install the ceramic floor bolt cover plates (

O

by  firmly  pressing  the  ceramic  floor  bolt  cover 
plates  (

O

)  into  the  recesses  in  the  side  wall  of 

the toilet (

A

). (Six additional strips of hook and 

loop tape (

P

) are provided should replacements 

be needed in the future.)

6. The fill valve coupling nut (

H

) is provided to 

connect  the  water  supply  line  to  the  fill  valve.  

Do  not  use  pipe  dope!    Hand  tighten  only! 

Overtightening  may  split  the  fill  valve  and  will 
void the warranty.

7. If using 

flexible water supply line

 (not includ-

ed), assemble the 

flexible water supply line

 to 

the threads of the tank fill valve. Do not use Tef-
lon tape or pipe dope on the fill valve threads. 
This  could  result  in  over-tightening  and  break-
age.

8. Make sure refill tube adaptor

 

(

I

) is attached to 

the top of the flush valve overflow tube. Note: 
Flow from the refill tube must be positioned di-
rectly over the overflow tube.

9. 

IMPORTANT:  Always  clear  sand  and  rust 

from system.

Remove valve top by lifting arm and rotat-
ing top 1/8 turn counterclockwise.

While  holding  a  container  over  the  un-
capped  valve  to  prevent  splashing,  turn 
water supply on and off a few times. Leave 
water supply off.       

Replace top by engaging lugs and rotating 
1/8  turn  clockwise. 

Make  certain  top  is 

turned to the locked position. Valve may 
not turn on if the top is not fully turned 
to the locked position. 

Summary of Contents for Orrington Series

Page 1: ...2383 OR VISIT WWW DANZE COM 2007 DANZE INC ALL RIGHTS RESERVED Espa ol p gina Espa ol 1 Fran ais page Fran ais 1 Pub No IM DC011223 08 07 01 DC011223 Orrington Collection One Piece Toilet Installatio...

Page 2: ...us at our website www danze com or call our technical service center during business hours at 888 328 2383 Danze Inc reserves the right to make product specification changes and to change or disconti...

Page 3: ...nd Nuts 2 each required Adjustable wrench Regular Screwdriver Safety Glasses Carpenter s Level Tools required X Homeowner Care Manual Y Warranty Parts Guide Flexible Water Supply Line 3 8 S P S SUPPLY...

Page 4: ...k and loop tape P are provided should replacements be needed in the future 6 The fill valve coupling nut H is provided to connect the water supply line to the fill valve Do not use pipe dope Hand tigh...

Page 5: ...RCELANA VITRIFICADA DE DANZE Los productos de porcelana vitrificada de Danze comprenden inodoros bid s y lavabos Nuestros aparatos sanitarios son el resultado del dise o y de las tec nolog as m s mode...

Page 6: ...de cera 1 necesario Pernos de instalaci n arandelas y tuercas 2 de cada necesarios Llave ajustable Destornillador normal Anteojos protectores Nivel de carpintero O M N H A Tubo flexible de aliment ac...

Page 7: ...n la v lvula de llenado No utilice pasta lubrificante Apriete a mano nicamente Si aprieta demasiado puede partir la v lvula de lle nado y ello anular la garant a 7 Si utiliza un tubo de alimentaci n d...

Page 8: ...s que vous pourrez utiliser nos produits des ann es durant sans probl me et en toute beaut Produits de porcelaine vitrifi e Danze Les produits de porcelaine vitrifi e Danze comprennent les toilettes...

Page 9: ...et crous 2 ch requis Cl molette Tournevis ordinaire Lunettes de s curit Niveau de menuisier OUTILS REQUIS Couteau mastic O M N H A Conduite d alimentation en eau flexible facultative requise uniquemen...

Page 10: ...ult rieurement 6 L crou d accouplement de robinet flot teur H est fourni pour raccorder la conduite d alimentation en eau au robinet flotteur Ne pas employer de p te joint Serrer la main uniquement Si...

Page 11: ...il co ncide avec la ligne servant de rep re Tourner la vis de r glage de niveau d eau J pour d placer la coupelle flottante K vers le haut ou vers le bas 12 V rifier que la manette du r servoir L fonc...

Reviews: