![Dantherm DanX 1 XD User Manual Download Page 9](http://html1.mh-extra.com/html/dantherm/danx-1-xd/danx-1-xd_user-manual_4362222009.webp)
3. INSTALLATION
7
3.3 Installation of unit
Before placing the unit, the wooden pallet has to be removed and the separate delivered feet
mounted on the base frame. To do so the following has to be done:
•
Unwrap the module, open the inspection door and take out the separate box with the
feet.
•
Lift the unit with a fork lift or pallet lift and unscrew the wooden pallet (1).
•
Screw the feet (2) on the base frame and place the unit where it should be installed.
•
For transport reasons the handles are not fitted from the factory. Find the handles
inside the unit and fit one handle with lock and one without in each door. The handle
(1) is fixed to the lock with a screw (2) and the plastic blinder (3) is pressed into the
handle.
3.4 Duct mounting
The ducts connected to the unit must be suspended or underpinned with support elements,
if you fit the ducts on the side of the unit, as the duct connection panels are not strong
enough to hold the duct work.
The ducts can be connected to the DanX 1/2/3 directly, or with flexible connections to
suppress vibrations of the unit. For the flexible connection to work probably, it is important
that it is not totally stretched. When a flexible connection is used, an earth connection must
be mounted between unit and duct work.
Summary of Contents for DanX 1 XD
Page 1: ...DanX 1 2 3 WEB User manual Rev 2 2 090650 en...
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...Dantherm A S Marienlystvej 65 7800 Skive Denmark service dantherm com 068011 090650...