
DNA1880YM2 EXPLOSION PROOF INFRARED PTZ CAMERA·MANUAL
13
2.3 Installation
2.3 Installation
2.3 Installation
2.3 Installation optional
optional
optional
optional bracket
bracket
bracket
bracket
In order to avoid excessive shaking from panning and tilting, it is best to install at top of
pole.
The user should choose the proper fastener to avoid of falling, rusting or damage.
2.
2.
2.
2.3333....1111 Fix br
Fix br
Fix br
Fix bracket
acket
acket
acket
Choose the proper position on wall for bracket. Fix camera on wall bracket in right
surveillance angle. Finally, choose qualified anchor bolt or expansion screw to fix
bracket on wall. Explosion proof junction box is installed at position, where is easy to
maintenance, as fig 2.3.1.1 showed. Cable is thread from trucking to junction box.
Wall mounted bracket fig 2.3.1.2; 2.3.1.3; 2.3.1.4.
bracket
wall
explosion proof
junction box
trunking or
cable bridge
Fig 2.3.1.1 wall bracket fix way Fig 2.3.1.2 wall bracket fix hole
Fig 2.3.1.3 wall bracket front view
Summary of Contents for DNZ1880YM2
Page 23: ...i Network Camera Web3 0 Operation Manual Version 1 0 1...
Page 76: ...49 Figure 5 18 Figure 5 19...
Page 77: ...50 Figure 5 20 Figure 5 21...
Page 141: ...114 Figure 5 84 Figure 5 85...
Page 162: ...135 Figure 5 117...