![Danfoss VLT PROFIBUS DP MCA 101 Programming Manual Download Page 16](http://html1.mh-extra.com/html/danfoss/vlt-profibus-dp-mca-101/vlt-profibus-dp-mca-101_programming-manual_3708540016.webp)
CTW/STW REF/MAV
PCD 2
Read/
Write
PCD 3
Read/
Write
Standard telegram
1
PCD 4
Read/
Write
PCD 5
Read/
Write
PPO 4
PPO 6
PPO 7
PPO 8
Danfoss telegram
(The old PPO type 3)
PCV
CTW/STW REF/MAV
PCD 2
Read/
Write
PCD 3
Read/
Write
PCD 4
Read/
Write
PCD 5
Read/
Write
CTW/STW REF/MAV
PCD 2
Read/
Write
PCD 3
Read/
Write
PCD 4
Read/
Write
PCD 5
Read/
Write
PCD 6
Read/
Write
PCD 7
Read/
Write
PCD 8
Read/
Write
PCD 9
Read/
Write
CTW/STW REF/MAV
PCD 2
Read/
Write
PCD 3
Read/
Write
PCD 4
Read/
Write
PCD 5
Read/
Write
PCD 6
Read/
Write
PCD 7
Read/
Write
CTW/STW REF/MAV
CTW/STW REF/MAV
PPO 3
CTW/STW REF/MAV
PCD 2
Read/
Write
PCD 3
Read/
Write
PPO 2
PCV
CTW/STW REF/MAV
PPO 1
PCV
130BD911.10
Illustration 4.1 Available PPO Types
4.2 Process Data
Use the process data part of the PPO to control and
monitor the frequency converter via the PROFIBUS.
4.2.1 Process Control Data
Process control data (PCD) is the process data sent from
the PLC to the frequency converter.
Master/follower
1
2
3
.......
10
CTW
MRV
PCD
.......
PCD
PCD write
Table 4.1 Process Control Data
PCD 1 contains a 16-bit control word, and each bit controls
a specific function of the frequency converter, see
.
PCD 2 contains a 16-bit speed setpoint in percentage
format. See
chapter 4.2.3 Reference Handling
The content of PCD 3 to PCD 10 is determined by the
settings in
parameter 9-15 PCD Write Configuration
and
parameter 9-16 PCD Read Configuration
4.2.2 Process Status Data
Process status data is the process data sent from the
frequency converter, and contains information about the
current state.
Follower master
1
2
3
......
10
STW
MAV
PCD
......
PCD
PCD read
Table 4.2 Process Status Data
PCD 1 contains a 16-bit status word, and each bit contains
information regarding a possible state of the frequency
converter.
PCD 2 contains per default the value of the current speed
of the frequency converter in percentage format (see
chapter 4.2.3 Reference Handling
). PCD 2 can be configured
to contain other process signals.
Control
Programming Guide
14
Danfoss A/S © Rev. 05/2014 All rights reserved.
MG37G102
4
4