DTA
LPU
SFV
FI
29
3/
23
2
Fs
G
2
2
22
25
N
1
G
R
Q
P
3
D
37
Z4
M
Q
HEL
5
4
Z1
3
VQ.MP.C1.02
© Danfoss 12/2018
DHS-SMTL / PL
In this figure, you can see all loose
supplied components and prefabricated
pipe parts with their corresponding
positions in the system.
First find a level surface and align the heat
exchanger and the domestic water storage
tank accordingly in their position. Make
sure both units are positioned horizontally
at the same height; this is the only way the
supplied components and tubes fit perfectly.
Connect all parts according to the
drawing, using the respective screwed
connections, and do not forget to insert
the loose enclosed gaskets beforehand.
When assembling, adjust the tank
and heat exchanger again where
necessary to prevent stress.
Quick Guide
ThermoDual®-GS
VQMPC102_ThermoDual-GS_181220.indd 3
20.12.2018 08:55:40