Creating
new project
(continued)
7.
Fill in the Branch name,
Valve, Requested flow and
the Initial presetting. The
other fields will be filled
automatically during the
branch measuring or after
the balancing calculation.
8. Similarly to the Input
pressure, it will be possible
to measure the Initial flow
and Disposal pressure.
9.
Add the rest of the
branches included in the
project by following the
instructions. Note that the
order of branches in the
project must correspond to
the distance of each branch
from the input pressure
source.
10. The correct order of
branches in the project can
be set by moving selected
branch up or down in the
project structure.
HEC
35
Summary of Contents for PFM 5001
Page 1: ...User Guide PFM 5001 Measuring Instrument...
Page 2: ...HEC...
Page 4: ...HEC...
Page 8: ...PFM 5001 measuring unit 8 HEC...
Page 44: ......
Page 46: ......