© Danfoss | Climate solutions | 2023.09
6 | AN461947453648en-000101
Further languages and documentation
www.icadb.danfoss.com
Page 1: ...80 80 168 Nm LB feet mm ICAD 600B ICAD 600B TS ICAD 1200B ICM ICAD 600B ICAD 600B TS 1 2 3 4 5a 5b ICM ICAD 1200B Before installing ICAD on ICM please read the separate guide Mechanical in tallation o...
Page 2: ...own C Red D Orange E Yellow F Green G Blue EKC 347 EKC 315A EKC 361 Only possible with EKC 347 A Black B Brown C Red D Orange E Yellow F Green G Blue EKE 347 Only possible with EKE 347 Only possible w...
Page 3: ...has two M12 male and one M12 female connectors build in Power supply 4 poled M12 male connector Control signals 8 poled M12 male connector Data communication 4 poled M12 female connector Power Supply...
Page 4: ...defined to start operation Follow the steps on next page to set this up correctly ICAD name Status Actual opening degree STATUS BAR STATUS BAR Alarm Warning Service overdue Modbus address Bluetooth ON...
Page 5: ...n Continue to next step or press to get back to main screen Press down until Service is selected then press enter Press enter Pressing and holding will go directly to the passcode screen Enter the 8 d...
Page 6: ...Danfoss Climate solutions 2023 09 6 AN461947453648en 000101 Further languages and documentation www icadb danfoss com...