background image

Operator’s Manual

Danfoss FT1312  

Hose Proof Test Stand

Summary of Contents for FT1312

Page 1: ...Operator s Manual Danfoss FT1312 Hose Proof Test Stand...

Page 2: ...assembly equipment with powered moving components Safety glasses must be worn at all times when using any Danfoss assembly equipment Read and understand the owners and operators manual before attempti...

Page 3: ...floor capable of holding 750 pounds An area 9 5 feet by 6 feet should be allocated for the machine and working area Remove the clear plastic air lubricator bowl adjacent to the air pressure regulator...

Page 4: ...djust the air regulator valve clockwise allowing the pumping action to begin Steadily increase air pressure until the test pressure is approaching then back off the air pressure until the pumping slow...

Page 5: ...cleaning the see through lid with clean soapy water Do not use petroleum or chemical solvents on the see through lid Use only mild detergent PROBLEM SOLUTION Test pressure not attainable during operat...

Page 6: ...599 32 SAE 45 Swivel 4 2000 6 4B 2081 12 6S 2022 5 8S 900599 4 5 2000 6 5B 2081 12 6S 2022 12 8S 900599 5 6 2000 6 6B 2081 12 6S 2022 12 8S 2001 6 6B 2082 6S 8 2000 12 8B 2022 12 8S 900599 8 10 2000 1...

Page 7: ...sure Port Plug or Cap 4 FF2031T0404S 2022 4 8S FF9767 04S 6 FF2031T0604S 2022 4 8S FF9767 06S 8 FF2031T0806S 2022 6 8S FF9767 08S 10 FF2031T1008S 2022 8 8S FF9767 10S 12 FF2031T1208S 2022 8 8S FF9767...

Page 8: ...4 Danfoss FT1312 Hose Proof Test Stand Operators Manual 8 Danfoss FT1312 Hose Proof Test Stand Operators Manual 2023 06 AQ452153740268en 010101 FT1312 Hose Proof Test Stand...

Page 9: ...Cap Screw Stainless Steel 8 8 FT1312 3 8 Handle backing Plate 2 9 FT1312 3 9 10 24 Stainless Steel Jam Nut 8 10 FT1312 3 10 Clamp 2 11 FT1312 3 11 Latch Plate 2 12 FT1312 3 12 Latch Plate Mounting Pad...

Page 10: ...Danfoss FT1312 Hose Proof Test Stand Operators Manual 10 Danfoss FT1312 Hose Proof Test Stand Operators Manual 2023 06 AQ452153740268en 010101 FT1312 Power Unit...

Page 11: ...ly 1 6 FT1312 2 5 6 Bracket 1 7 FT1312 2 5 7 Valve H P 1 8 FT1312 2 5 8 Nipple Assembly 1 9 FT1312 2 5 9 Pump 1 10 FT1312 2 5 10 Air Valve Shut Off 1 11 FT1312 2 5 11 Muffler 3 8 NPT 1 12 FT1312 2 5 1...

Page 12: ...ed to use tap water eliminating the need for a special test fluid Compact power unit is air driven Tests assemblies up to 2 inches inside diameter 6 spiral wire Cabinet construction withstands hose as...

Page 13: ...16S 20 2040 16 20S 2040 12 16S 2046 20 20S 2082 20S 24 2040 20 24S 2040 12 16S 2040 16 20S 2022 8 8S 2046 24 24S 2082 24S 32 2040 24 32S 2040 12 16S 2040 16 20S 2040 20 24S 2022 8 8S 2046 32 32S 2082...

Page 14: ...ariety of equipment and applications around the world We proudly engineer to support a sustainable future for tomorrow To learn more please visit http www danfoss com en about danfoss our businesses p...

Reviews: