4.2 Intermediate storage of machine/unit
If the machine/unit cannot be mounted immediately upon delivery, it
must be protected against:
•
Contamination,
•
Weather influences,
•
Mechanical damage.
The machine/unit components may only be stored in closed rooms
and under the following conditions:
•
temperature between 10°C and 35°C,
•
maximum air humidity 80% (non-condensating).
4.3 Commissioning
The machine is commissioned by the customer's fitter.
1.
Place the machine on a stable and level workbench.
2.
Bolt the machine onto the workbench.
The workbench must be sufficiently solid and stable.
Place the machine in a way so that it is easily accessible for main-
tenance work from all sides.
3.
Check the machine for damage.
4.
Check the electric cables for damage.
5.
Train
the operating staff and record training sessions in “Decla-
ration of trained staff”, Section 9.
Summary of Contents for ET4300
Page 1: ......
Page 3: ......
Page 66: ...Retaining bolt Crimping die profile 262 263 239 266 232 237 554 245 246 247 245 114 4 x x x...
Page 67: ...9 7 Hydraulic diagram...
Page 68: ...9 8 Electric diagram 400V 50Hz 3Ph...
Page 69: ...380 V 50 60 Hz 3 phases...
Page 72: ......
Page 73: ......
Page 74: ......