5.7 Stop
1.
Complete the forming process.
2.
Deposit the work piece outside the machine.
3.
Deactivate the main switch (1).
4.
Check the machine for contamination, leaks and external da-
mage.
5.
Check the crimping tool and retaining bolts for contamination,
damage and secure fitting.
6.
Check the oil level.
7.
Remove contamination, dust and chips using a vacuum.
Inform the fitter in case of damage or other irregularities.
Summary of Contents for ET4300
Page 1: ......
Page 3: ......
Page 66: ...Retaining bolt Crimping die profile 262 263 239 266 232 237 554 245 246 247 245 114 4 x x x...
Page 67: ...9 7 Hydraulic diagram...
Page 68: ...9 8 Electric diagram 400V 50Hz 3Ph...
Page 69: ...380 V 50 60 Hz 3 phases...
Page 72: ......
Page 73: ......
Page 74: ......