Hand pump 262.3013
The drainage valve hand wheel (1) must be closed for forming.
1.
Open the oil filling screw / bleed screw (2) by a quarter turn to
balance the air pressure in the oil tank.
2.
Manually position the pre-mounted work piece in the tool.
3.
Hold the work piece with one hand during the forming process.
4.
Operate the pump handle (3) until the signal lamp lights up.
The crimping dimension is reached.
5.
Adjust pumps.
Keep the drainage valve hand wheel closed longer for large fittings
(manual holding time).
Holding time = time interval in which the plastic forming of the work
piece is completed.
6.
Open the drainage valve hand wheel.
7.
Remove the work piece from the tool.
8.
Check the forming dimension after the first forming process.
Correct the forming dimension if there are any deviations be-
tween the actual dimension and the specified dimension (see
"Setting the forming dimension" in Section 5).
Summary of Contents for ET4100
Page 1: ......
Page 3: ......
Page 46: ...9 1 Machine overview...
Page 53: ...Retaining bolt Crimping die profile 262 263 239 266 232 237 554 245 246 247 245 114 4 x x x...
Page 54: ...9 6 Hydraulic diagram...
Page 56: ......
Page 58: ......
Page 59: ......
Page 60: ......