6.4
Connection brine
6.4.1
Drill holes for brine pipes
Caution
Ensure that the holes for the insert pipes are positioned so that there is
room for the other installations.
Caution
The brine pipes shall have separate lead-ins. If the wall lead-ins are be-
low the highest ground water level watertight lead-ins must be used.
The brine pipes must be insulated from the heat pump, through the walls and outside the house all the way to the collector so as to
avoid condensation and prevent heat loss.
If the brine pipes are to be routed above ground, drill holes in the walls for them.
If the brine pipes are to be routed below ground see the instructions below.
1
1
2
3
3
4
1. Insert pipe
2. Brine pipe
3. Mortar
4. Sealant
1. Drill holes in the wall for the insert pipes (1) for the brine pipes. Follow the dimension and connection diagrams. If there is any risk
of groundwater infiltration at brine pipe lead-ins, watertight grommets must be used.
2. Position the insert pipes (1) in the holes sloping downwards. The inclination must be at least 1cm every 30 cm. Cut them at an angle
(as illustrated) so that rain water cannot get into the pipes.
3. Insert the brine pipes (2) into the insert pipes in the installation room.
4. Fill in the holes around the lines with mortar (3).
5. Ensure that the brine pipes (2) are centered in the insert pipes (1) so that the insulation is distributed equally on all sides.
6. Seal the insert pipes (1) with a suitable sealant (foam) (4).
Installation Guide
DHP-M
Danfoss Heating Solutions
VIJSW102
19
Summary of Contents for DHP-M
Page 1: ...MAKING MODERN LIVING POSSIBLE Installation Guide DHP M www heating danfoss com...
Page 32: ...Installation Guide DHP M VIJSW102 Danfoss Heating Solutions 32...
Page 33: ...Installation Guide DHP M Danfoss Heating Solutions VIJSW102 33...
Page 34: ...Installation Guide DHP M VIJSW102 Danfoss Heating Solutions 34...
Page 35: ...Installation Guide DHP M Danfoss Heating Solutions VIJSW102 35...