
6
Manual test
Caution
The installation may only be commissioned if the heating system and
water heater have been filled and bled. Otherwise the circulation
pumps and auxiliary heating, if installed, may become damaged.
Caution
Any alarms that may occur in connection with the commissioning
must be fault-traced.
N
Class A alarms will prevent the heat pump from starting.
N
The heat pump has a starting time of about 5 - 10 minutes.
6.1
Activate manual test
N
The manual test is active for 8 hours. After 8 hours the unlocking code
must be entered again.
Remaining time is shown in the upper part of the display.
Ensure that the main circuit breaker is on.
1. Press
on the Start screen to open the Menu screen.
2. Press
3. Enter the code for installer access: 60,70,80.
4. Press on Settings
.
5. Press to go to the menu page for Manual test.
6. Press on the text Manual test.
7. Press
to activate manual test.
8. Select test case on the various menu pages.
N
During MANUAL TEST, this symbol is shown on all screens:
N
Mandatory test cases are described in the following chapters.
Test cases not described are optional.
Commissioning
DHP-H Varius Pro+/DHP-L Varius Pro+
VIJSG202
Danfoss Heating Solutions
22