
Installation of the end seal
Cut the trace heater off straight
Remove ¾” (20 mm) of the outer jacket on the trace heater
Remove the exposed grounding braid Make sure that the insulation jacket is not damaged
Cut in a triangle (¼” (5 mm)) between the bus wires
Ground
20
23
24
25
21
22
Installation Instruction
© Danfoss | 2017 11 | 13
VILWC122
Power connection kit - Cable to Junction Box with ½” NPT cable gland