Rigging/Derigging
6. Raise the back of the bottom cabinet.
7. Align the prepared Splay link with the corresponding hole of
the rear rigging strand of the upper cabinet.
8. Insert the Locking pins and ensure the pins are fully inserted
and properly locked.
To add further cabinets, proceed in the same manner until the
assembly is completed.
5. Rig the cabling
Connect the flying cables and link cables according to the number
of amplifier channels and cabinets used. Observe the related
loudspeaker setups for the inner (In) and outer (Out) cabinets.
6. Check the assembly
Before hoisting the array to its operating position, recheck the
entire assembly.
3.3 Hoisting and securing the array
When all the mechanical adjustments, system checks, and safety
checks have been made, the array can be hoisted up to its
operating position.
When hoisting the array, ensure that the loudspeaker cables do
not get caught anywhere. The cables can be strapped together
with the motor cable to form a loom while the system is hoisted.
The chain hoist motors must raise the system slowly and evenly so
that it does not swing or move from side to side during hoisting.
When the array is in its final operating position, the secondary
safety device must be attached (please also refer to
Chapter 2.3 "Secondary safety" on page 7).
3.4 Derigging
To dismantle any of the assemblies, follow the corresponding
rigging and setup instructions in reverse order.
The same safety instructions apply!
d&b Z5455
AL Flying frame Rigging manual 1.1 en
16