15
Manual
Attention! Coverage sheet side edge is aligned by elements 7, 8, and top
edge on 30 mm above bottom edge of element 5. Mark by elements 4н
and 4в with allowance.
Mount cellular polycarbonate strictly facing sun with a side having protective
layer (by all means, clarify it under purchase or before mounting). Protective
layer usually is on the side with inscriptions on transport film. On the other side
of sheet film is clear. After marking the sheet but before its cutting make marks
on protective side of each piece of sheet: after removal of transport film sheet
sides have no visual differences. Transport film is removed from both sides
immediately before fastening
coverage on the frame.
Pic. 14
8
5
2
4в
Coverage
marking
2100
30 mm
marking
- points for mounting of
armsfor coverage fastening
Angle
(inside view)
1940
of elements 7 and 8, and top edge at 30 mm above bottom edge of element 5. Cut
a stencil. Mark the rest of sheet using the stencil in accordance with cutting scheme
(
Pic.13а или Pic 13б
.
Summary of Contents for ARROW 3m Series
Page 1: ...20 03 2018 for Greenhouse ARROW 3 0 Manual...
Page 2: ...any length multipple to 2m width 3 0 m height 2 4 m...
Page 24: ...Manual 23 Cutting and fastening of coverage 3 M4x25 3 do not fully tighten 12...
Page 25: ...Manual 24 13 1 Adhesive tape Cutting and fastening of coverage...
Page 26: ...Manual 25 14 4 4 M4x35 4 1 3 M4x25 3 L 1 0m Cutting and fastening of coverage...