background image

4

Technical certificate

Detailed list of parts for Inset

Package 1

2

balk

20

Package 2

3

support

4

1

stand

4

bottom arc

4

top arc

4

9

horizontal strainer

2

10

side brace

8

11

brace strut liner

4

18

stiffening boom

4

Package 3

ridge profile

2

Package  4

angle

8

ridge cover plate

2

bottom wire bandage

4

top wire bandage

2

screw M5x10

150

screw M5x14

4

screw M5x35

16

screw M4x8

4

screw M4x35

8

nutM4

12

Nut M5

174

Nut M6

8

washer

16

washer M6

8

boltМ6х60

4

profile L=1,0m

4

double sided tapeL=4m

1

Chart 

5

Small window detailed parts list – 7th package

Name

Quantity (pcs)

Package 1

ф1

long bar

2

ф2

short bar

2

ф3

long diagonal

1

ф4

short diagonal

1

wire stop

1

wire extender

1

Package 2

arm

1

polycarbonate

0,95x0,43

sealer

0,95 m

heave-off hinge

2

screw M5x10

25

screw M5x35

8

washer 32х5

8

nut M5

37

clamp

2

Chart 

6

Summary of Contents for ARROW 3m Series

Page 1: ...20 03 2018 for Greenhouse ARROW 3 0 Manual...

Page 2: ...any length multipple to 2m width 3 0 m height 2 4 m...

Page 3: ...ts are supplied following the customer s request The greenhouse has two door openings and two ventilating windows in the opposite ends Side ventilating windows are supplied following the customer s re...

Page 4: ...Side brace 4 11 Brace spreader 2 13 Door horizontal part 6 16 Butt end strap 2 17 Door strap for the latch 4 18 Reinforcement nogging piece 2 21 middle strainer 4 Left tubular reinforcement 2 Right t...

Page 5: ...op wire bandage 2 screw M5x10 150 screw M5x14 4 screw M5x35 16 screw M4x8 4 screw M4x35 8 nutM4 12 Nut M5 174 Nut M6 8 washer 16 washer M6 8 bolt 6 60 4 profile L 1 0m 4 double sided tapeL 4m 1 Chart...

Page 6: ...In case of regions Do not install greenhouse close to buildings and trees from which snow or ice can fall down Minimal 2 m distance is recommended with snow cover exceeding 0 6 m thicker polycarbonat...

Page 7: ...e specified weather conditions 4 Time period for making claims is 24 months after the day of purchase Warranty provisions Warranty responsibility shall not cover the following cases 1 Installation of...

Page 8: ...arts as they do not have sufficient endurance before the whole structure is assembled Use supports e g chairs at interim stages of assembly to make sure the frame is lifted steadily and evenly To make...

Page 9: ...inside view outside view 4 angle angle 4 2 2 4 6 2 1 arm 4 outside view 4 5 arm 7 1 6 6 inside view 4 2 3 1 Pic 1 outside view inside view arm 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 8 8 5 6 6 7 7 6 10 10 10...

Page 10: ...e Greenhouse ARROW extended by any number of inserts Pic 2 Pic 3 858 4060 1000 1000 1000 1000 3000 Greenhouse foundation support layout plan Pic 4 1071 60 21 General view of insert for Greenhouse ARRO...

Page 11: ...enhouse Install greenhouse in accordance with photographs of installation stages and units represented in Pic 5 12 The figures show installation of greenhouse of 4 m length Required length is reached...

Page 12: ...arm 6 Pic 7 Connect arcs 4 to arcs 4 from one side of greenhouse Connect balks 2 to arcs 4 Pic 9 Connect arcs 4 and balks 2 from the other side of reenhouse in the same way Assembling stages Manual 4...

Page 13: ...h arc inside of greenhouse frame Assemble side brace assembled from two elements 10 Mount side brace liner 11 on the joint of elements 10 and connect it to arc 4 9 9 18 18 10 4 10 2 2 Assembling stage...

Page 14: ...led door and end small window Assemble door and end small window from elements12 13 14 15 Pic 12 14 14 14 12 12 12 12 12 13 15 15 15 15 19 19 20 20 14 15 Pic 12 12 13 14 13 13 13 13 15 15 14 14 14 12...

Page 15: ...sit stencil marking on the coverage sheet by elements 4 and 4 with allowance Pic 14 When marking a sheet align its edge strictly with edges CUT POLYCARBONATE SHEET STRICTLY IN ACCORDANCE WITH Pic 13 o...

Page 16: ...eet film is clear After marking the sheet but before its cutting make marks on protective side of each piece of sheet after removal of transport film sheet sides have no visual differences Transport f...

Page 17: ...ten it with screws and washers by elements 6 7 8 21 and by angles using tap screws with washers Holes for screws are drilled by boring bit of 5 mm diameter from inside of greenhouse through holes in f...

Page 18: ...or sealer hinge sealer hinge sealer overage overage overage 17 screw 5 14 handle handle handle overage adhesive tape door sealer hinge adhesive tape door sealer hinge sealer overage door sealer door s...

Page 19: ...our door door washer 12 8 screw 5 35 screw 5 35 door overage small window overage door overage ridged panel 16 screw 5 50 screw 5 35 5 door sealer door sealer door sealer 19 19 13 13 6 small window Pi...

Page 20: ...rs and the hooks on the end install in accordance with Pic 24 Pic 24 washer washer hook end overage Angle Angle screw 4 10 screw 5 35 The ground 16 2 8 Install tubular reinforcing element door opening...

Page 21: ...on use the tube to bend linear part by hand into opposite outside of the greenhouse direction Pic 27 Set elastic header on the rotator Pic 28 This construction allows to push the door in the closed po...

Page 22: ...film The film on the other side of sheet is transparent After marking the sheet but prior to its cutting make a mark on the protected side of the sheet for each piece after removal of the transport fi...

Page 23: ...age 1000 1 2 L 1 05m Two side adhesive tape Before coating it is necessary to cut the outer surface of the upper polycarbonate sheet for bending on the ridge middle of sheet The arrow on the details i...

Page 24: ...Manual 23 Cutting and fastening of coverage 3 M4x25 3 do not fully tighten 12...

Page 25: ...Manual 24 13 1 Adhesive tape Cutting and fastening of coverage...

Page 26: ...Manual 25 14 4 4 M4x35 4 1 3 M4x25 3 L 1 0m Cutting and fastening of coverage...

Page 27: ...Manual 26 16 Details of ridge profile are joined in the length with the installation of the threaded end of the screws out screw 5 14 Cutting and fastening of coverage 15...

Page 28: ...Manual 27 Ridge profile 1 M6x60 M6 1 2 1 1 top wire bandage M6x60 M6 1 2 1 1 top wire bandage Cutting and fastening of coverage...

Page 29: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: