Assemble arcs 4в in pairs using ridge cover
plate and strainer 9. Connect end elements
5 to arcs 4в using arm.
Connect balks 2 to
assembled arcs.
2
2
4в
Assembling stages
Pic. 5
Pic.6
Level the frame using filling or deepening of pits to make longitudinal elements straight,
horizontal and parallel to each other and to make arcs even at side view. If arc planes
require leveling, loosen connections of balks with arcs, complete leveling on the ground
and tight screws again. Fill frame supports with soil after fastening bottom wire bandages
on element 3 (
Pic.10
)
Perform the installation close to location of the greenhouse.
Install greenhouse in accordance with photographs of installation stages and units
represented in
Pic. 5
…
12
. The figures show installation of greenhouse of 4 m length.
Required length is reached using attachment of appropriate number of Insert
packages. Use M5x10 screws for connection of elements.
Dig pits on the site selected for greenhouse installation at a depth of shovel blade
according to
Pic. 4
Install frame into the pits. Check equality of frame diagonals using
a cord. Total draft of greenhouse into the ground should be so that bottom elements 6
of door opening touch the ground. Check equality of the diagonals using a cord again
and correct position of the frame angles.
1.
2.
3.
4.
Installation sequence
4в
5
5
5
2
2
2
2
2
2
2
2
2
2
2
2
arm
Manual
ridge cover
plate
4в
4в
4в
4в
4в
4в
4в
4в
4в
4в
4в
Б
4в
9
9
9
9
А
Б
В
А
Б
В
Summary of Contents for ARROW 3m Series
Page 1: ...20 03 2018 for Greenhouse ARROW 3 0 Manual...
Page 2: ...any length multipple to 2m width 3 0 m height 2 4 m...
Page 24: ...Manual 23 Cutting and fastening of coverage 3 M4x25 3 do not fully tighten 12...
Page 25: ...Manual 24 13 1 Adhesive tape Cutting and fastening of coverage...
Page 26: ...Manual 25 14 4 4 M4x35 4 1 3 M4x25 3 L 1 0m Cutting and fastening of coverage...