22
Dana Incorporated
IMM-0016EN - Installation and Maintenance Manual
6 THINKS TO CHECK BEFORE THE GEAR UNIT OR GEARED MOTOR IS INSTAL-
LED
Before you install the gearbox you have to be sure that the gearbox is arrived with the all necessary equipment and without
damage. Points to take into consideration before you start to install the unit;
•
You have received the correct operation manual of the your product.
•
The gearbox and all its parts are transported without damage.
•
The gearbox is stored correctly according the instructions in this manual
•
You have the latest product catalogue or you have access to our web page
6.1 TRANSPORTATION
When the goods arrive, first check for any damage. If some damage observed, immediately contact the transport company and
inform about the damage. Contact Dana Motion Systems Italia S.r.l. for the damage and do not start to install the unit until it is
agreed that the damage has no affect of operation.
NOTE:
If geared motors are used, please also refer to the manual of the motor manufacturer.
DANGER
Falling or hard placement can damage the gear unit.
Only use hoisting and securing equipment which is permitted for the size / weight of your gear unit. Ensure that the load is
slowly and carefully handled and placed.
DANGER
Use the supplied eyebolts or lifting holes for lifting up the gear unit. The eyebolts are capable to carry the weight of
gearboxes only. Do not hang additional loads. Use suitable hoisting equipment which is capable to hold the gear
units weight. Refer to the catalogue for various types weights. See drawing bellow for hoisting point.
DANGER
Do not stay beneath / under the lifting/hoisting equipment which may cause serious injuries by falling down objects, accidental
movements, unexpected accidents.