MDF5450HD-DN Commissioning
Ø 5 mm (3×)
Ø 70 mm
B-❶
The drilling/cutting entry point should
always be on the later visible side of the
ceiling panel.
Panel thickness
t
< 9 mm or
t
> 18 mm