DF5200HD-IR-ANPR
20
www.dallmeier.com
8 Installation and Commissioning
The installation and commissioning of the device may only be carried out
by qualified personnel.
WARNING
Falling device/objects
Danger of death or serious injury
➡
Observe the manufacturer’s instructions about the maximum
adequate carrying capacity of the supporting structure.
➡
Always use screws suitable for your wall material.
➡
Always use the correct type of anchor for your wall type:
•
Plastic screw anchors for solid wall material (concrete/brick)
•
Toggle bolt style anchors for drywall / hollow wall type (plaster)
CAUTION
IR emitted from this product.
May be harmful to the eye
➡
Do not stare at operating lamp.
➡
Use appropriate shielding or eye protection.
The following tools/accessories are required for the installation:
•
Drilling template (included in delivery)
•
Marking tool (e.g. awl)
•
Drilling machine (for expansion nylon plug S6)
•
Torx (6-lobe drive) screwdriver (T25)
Summary of Contents for DF5200HD-IR-ANPR
Page 1: ...005748 1 0 5 2018 12 17 DF5200HD IR ANPR Commissioning English...
Page 3: ...1 1 1 1 1 1 4 4 4 1...
Page 4: ......
Page 37: ...DF5200HD IR ANPR www dallmeier com 37...
Page 43: ......