70 |
4. Commissioning and use
of the equipment
Carry out the following instructions with the help of the diagram shown in
Fig.1.
• Open the water supply tap (1 Fig.1).
• Turn on the electrical power switch (7 Fig.1) and turn the machine's main
switch clockwise (1 Fig.2); then verify that the display lights up.
• As soon as the machine is switched
on, the autofill function begins to fill
the boiler until the working level is
reached.
• Once the filling phase is comple-
te, the activated brew groups begin
to heat up, the values shown on the
display of each group start to flash.
• At the end of the heating phase the
values displayed on the display of
each group stop flashing, displaying
the temperature value set for each
brew group as well as the other parameters in the "Group Display" explained
in paragraph 6.
Info
Settings Cleaning Groups
10:51
Tue 28 Aug 2018