Electrical Installation
11
BLK
WHT
GND
Figure 5:
Load Center Power Connections (Cover Removed)
Power-On Self-Test (POST)
The display performs a self-test each time that power is turned on and the control
console is powered off or not connected. If the control console is connected and
powered on, the self-test does not run, and data from the control console appears on
the display after a few seconds. Each self-test pattern will vary depending on the model,
the number of drivers, and types of digits.
shows an example of the LED bar test
pattern that each digit performs.
Figure 6:
Digit Segment POST
Summary of Contents for SW-2001
Page 30: ...This page intentionally left blank ...
Page 32: ...This page intentionally left blank ...
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ...This page intentionally left blank ...
Page 56: ...This page intentionally left blank ...
Page 57: ......
Page 58: ......
Page 60: ......
Page 61: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 74: ......
Page 75: ......
Page 77: ......
Page 82: ...This page intentionally left blank ...