Section Splicing
11
18�
Section 3: Display Installation (p�6)
to install the billboard.
19�
Connect the signal splice
cables from the display top
section Signal A on the bottom
section to Signal A on the top
section and Signal B on the
bottom section to Signal B
on the top section. Refer to
.
20�
In multi-section displays,
connect the power splice
cable, located in the top
sections, to the power
interconnect jacks in each
bottom section term panel.
21�
Connect the signal splice
cables from the display top
section.
a�
Signal A on the top section
PLR to Signal B on the
bottom section PLR.
b�
Signal B on the top section PLR to Signal B on the bottom section.
22�
Refer to interconnect drawing,
Power and
Signal Cables
Will Be Coiled
Here Before
Splicing
Insert the
Provided PVC
Coupler Into
the Perimeter
Hole Before
Dropping
Cables Down
Signal Cables
Connect to the
Fiber Patch Panel
Located on the
Internal Vertical
Backsheet and
Doors Hidden
for Clarity
Power Cable
Connections
Made in the
Term Panel
Here
Figure 19:
Power and Signal Splice Connections