PCBs
Si001423E
10
Removal Procedure
4. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the main PCB.
1
Unfasten the 4 hooks
and remove the
electrical box cover.
2
Disconnect the
connectors [S2], [S52],
[S102].
[S2]: demand control PCB
[S52] [S102]: main PCB
3
Unfasten the 2 hooks
and remove the service
monitor PCB.
Hook
Electrical
box cover
Hook
(R21771)
[S102]
[S2]
[S52]
(R21772)
Hook
Hook
Service monitor PCB
(R21773)