PCBs
Si001423E
12
Removal Procedure
9
Disconnect the
connectors [HR1],
[HR2].
[HR1]: reactor (white)
[HR2]: reactor (blue)
The harness for [HR2] has a
ferrite core.
10
Remove the 3 screws
and unfasten the 4
hooks.
11
Lift up and remove the
main PCB.
2. Remove the reactor.
1
Remove the 3 screws
of the reactor and 1
screw of the ferrite core
fixing band.
2
Lift up and remove the
reactor.
Step
Procedure
Points
[HR1]
[HR2]
Ferrite core
(R21778)
Hook
Hook
Main PCB
(R21779)
(R21780)
Reactor
Ferrite core
(R21781)