Si001423E
PCBs
Removal Procedure
13
3. Remove the demand
control PCB.
1
Remove the 2 screws.
2
Lift up and remove the
demand control unit.
3
Unfasten the 2 hooks
and open the cover.
4
Disconnect the
connector [S206].
[S206]: terminal board for smart
meter
5
Remove the screw and
remove the demand
control PCB.
Step
Procedure
Points
(R21782)
Demand
control unit
(R21783)
Cover
[S206]
(R21784)
Demand control PCB
(R21785)