background image

Tetra

®

 PowerStrip Snap DS 

Installation Guide

7

Connect output side of 

power supply to first 

module. Connect the 

red stripe wire (+) of the 

LED system to the red wire 

(+) of the power supply. 

Connect the white wire (-) of 

the LED system to the black 

or blue wire (-) of the power 

supply. Connect AC line to 

input side of power supply.

Connect modules using twist-on 

wire connectors or in-line (IDC) 

connectors. Join white wires 

together and red striped wires 

together.  

Cap all exposed wires with 

appropriate end caps or apply 

electric grade (non-corrosive) silicone 

for additional weather protection. 

NOTES: 
•  Exceeding maximum load will cause the power supply to shut down. If overload occurs, remove excess load, recycle 

the input power to restart the power supply. 

•  All electrical connections should be suitably protected from mechanical damage and the environment.  Seal 

all connections in locations that may be exposed to water with electrical grade RTV silicone. See page 3 for 

recommended silicones.

• 

Must be used with 

Tetra® 24 Volt Power Supplies

.

• 

Additional supply wire may be necessary to bridge electrical connections.

• 

Wire nuts should be facing up so as not to collect water.

Electrical Connections

Power 

supply

First 

module

Last 

module

AC line

3

3

1

1

1

2

2

Summary of Contents for GE current Tetra PowerStrip Snap DS

Page 1: ...rentbyge com eu HU A telep t si tmutat s a biztnos gi inform ci k magyar nyelv v ltozata az al bbi c men tal lhat https products currentbyge com eu IT La versione italiana del manuale di installazione...

Page 2: ...lation RISQUE D INCENDIE OU DE CHOC LECTRIQUE L installation de l quipement de remplacement DEL exige Ia connaissance des syst mes lectriques pour enseignes Si non qualifi ne tentez pas d installation...

Page 3: ...y Dow Corning RTV 748 Non Corrosive Sealant White UL certified 18 AWG 0 82 mm2 supply wire UL certified 22 14 AWG 0 33 2 08 mm2 wire connectors or 18 14 AWG 0 82 2 08 mm2 inline IDC connectors 6 and 8...

Page 4: ...spacing Installation Using Tetra Snap Rails Align peg on top of the light module with hole on top of the Tetra Snap Rail and push module into rail until it snaps into place For added security fasten m...

Page 5: ...Connector must be secured with screws to the mounting rail Using Tetra Snap Interconnectors Alternative Mounting Using Tetra Snap T Connectors The modules may be attached to any structural member of t...

Page 6: ...low all federal and local regulations when disposing of neon tubing fluorescent tubes transformers and ballasts 3 Existing Signs Only If removal of the existing lighting equipment eliminates the disco...

Page 7: ...e non corrosive silicone for additional weather protection NOTES Exceeding maximum load will cause the power supply to shut down If overload occurs remove excess load recycle the input power to restar...

Page 8: ...wer Supply 20 ft 6 1 m 25 ft 7 6 m 35 ft 10 6 m 40 ft 12 1 m 100W Power Supply 20 ft 6 1 m 25 ft 7 6 m 35 ft 10 6 m 40 ft 12 1 m 180W Power Supply 20 ft 6 1 m 25 ft 7 6 m 35 ft 10 6 m 40 ft 12 1 m 300...

Reviews: