![background image](http://html1.mh-extra.com/html/daikin/uat100a/uat100a_installation-manual_2459157009.webp)
3
English
A
UAT(Y)(P)360, 420A
UAT(Y)(P)250, 300A
UAT(Y)(P)60~200A
1.4 Unit Lifting
Hanger brackets at 4 corner of the unit are
used for unit lifting purpose.
The angle A of the chain should be at least 45°,
and insulation should be added at 4 corner of
the chain to prevent the damage of the panel
when lifting.
Note: ESP = External Static Pressure
Drain trap for condensate
Drain piping
Drain trap
The drain piping should have a drain trap.
A
B
C
The drain pipe
should extend
below this level.
Lifting Beam
Spreader Bar
Chain
Lifting Holes for shackle
(4 corners)
Chain
Hanger Bracket
A
70mm
B
2C
C
2X ESP
INSTALLATION OF THE UNIT
1.5 Drain piping
A 1 FPT condensate drain fitting is provided. The drain pipe can
be led out at the front side.
The drain pipe must be provided with a trap on the outside of
the unit and also installed at an incline for proper drainage, as
shown in the right.
To prevent condensate formation and leakage, provide the drain
pipe with insulation to safeguard against sweating.
Upon completion of the piping work, check that there is no
leakage and that the water drains off properly.
•
•
•
•
1 IM-RTA-0612(4)DK-EN.indd 3
1 IM-RTA-0612(4)DK-EN.indd 3
6/26/14 3:18:16 PM
6/26/14 3:18:16 PM