Electrical Data
www.DaikinApplied.com 51
IOM 1206-13 • TRAILBLAZER
®
MODEL AGZ CHILLERS
Figure 55: Typical Heat Recovery Unit Field Wiring Diagram (Multi-Point Connection)
Notes:
1.) ALL FIELD WIRING TO BE INSTALLED AS
NEC CLASS 1 WIRING SYSTEM WITH
CONDUCTOR RATED 600 VOLTS.
2.) IF FIELD SUPPLIED, CONTROL POWER USER
MUST REMOVE FU6, AND WIRE NUMBERS
299, 301A INSIDE CONTROL PANEL
3.) ** = USE 'DRY CONTACTS' ONLY. DO NOT
SUPPLY FIELD POWER TO THIS CIRCUIT
4.) DO NOT SUPPLY FIELD POWER TO
24VAC OR 120VAC CONTROL CIRCUITS.
TB1
22
TB1
TO CIRCUIT 1
COMPRESSOR(S)
AND FAN MOTORS
120
VAC
FU5
T1
FU6
CONTROL CIRCUIT
FUSE
SEE NOTE 2
FU4
3 PHASE
POWER
SOURCE
DISCONNECT SWITCH
OR
POWER BLOCK
CIRCUIT BREAKER 1
(BY OTHERS)
DISCONNECT
(BY OTHERS)
N
120 VAC
OPTIONAL
FIELD SUPPLIED
CONTROL POWER
FU
TO CIRCUIT 2
COMPRESSOR(S)
AND FAN MOTORS
3 PHASE
POWER
SOURCE
DISCONNECT SWITCH
OR
POWER BLOCK
CIRCUIT BREAKER 2
(BY OTHERS)
15A for 1.5 KVA
30A for 3.0KVA
(BY OTHERS)
1A
301A
301
299
FIELD WIRING DIAGRAM
WITH MICROTECH CONTROLLER
EARTH
GROUND
NO
COM
BELL
ALARM BELL
RELAY
ALARM BELL
OPTION
1
2
EXTERNAL
ALARM/
EVENT
ABR
**
24VAC @ 0.4AMP MAX.
**
TB2
TB2
43
83
TB2
TB2
45
67
555A
IF EXTERNAL
ALARM/EVENT
IS USED
REMOVE LEAD 555A
FROM TERM
TB2-45 TO TB2-67
N
24 VAC
585
TB2
TB2
TB2
TB2
54
52
74
72
120 VAC
TB1
TB1
34
32A
IF REMOTE STOP
CONTROL IS USED
REMOVE LEAD 585
FROM TERM
TB2-52 TO TB2-72
DOUBLE SET POINT/MODE
SWITCH
(BY OTHERS)
** TIME CLOCK
OFF
MANUAL **
ON
AUTO
** TIME CLOCK
OFF
MANUAL **
ON
AUTO
REMOTE
STOP SWITCH
(BY OTHERS)
ALARM
BELL OPTION
ALARM BELL RELAY
120VAC @ 1.0AMP MAX
ABR
71
TB2
70
TB2
69
TB2
68
TB2
4-20MA FOR
DEMAND LIMIT
(BY OTHERS)
4-20MA FOR
EVAP. - LWT RESET
(BY OTHERS)
TO/FROM BAS
(CUSTOMER
CONNECTION)
(+)
(-)
REF
CONNECT TO GROUND
AT ONE END ONLY.
BACNET-MSTP
GND
(317)
TB7
N
TB7
TB7
TB7
TB2
100B
TB7
TB7
TB7
TB7
5
5
5
2
4
3
1
TB2
32
TB2
102
**Heat Recovery
Request Switch
HEAT RECOVERY
PUMP RELAY
120VAC @ 1.0 AMP MAX
**Flo HR
Heat Recovery
Pump Relay
Heat Recovery
Flow Switch
Heat Recovery
0-10 V DC Pump VFD
or 3-Way Valve
Heat Recovery
4-20mA Pump VFD
or 3-Way Valve
Heat Recovery
Pump
1
2
SVHR1
120VAC
120-
TBHR
120+
TBHR
FIELD POWER SUPPLY
TO HEAT RECOVERY
FREEZE PROTECTION
HEATERS (BY OTHERS)
120V
N
8
N
120 VAC
TB1
TB1
35
33
CHWR1
PUMP NO.1 RELAY
(BY OTHERS)
120VAC @ 1.0AMP MAX
N
TB1
31
120 VAC
P2+
TB1
CHWR2
PUMP NO.2 RELAY
(BY OTHERS)
120VAC @ 1.0AMP MAX
61
TB2
TB2
44 M
DI2
Flow Switch Contacts
Use dry contacts only. DO NOT
supply Field Power to this circuit
NOTE: For Factory Supplied Thermal
Dispersion Flow Switch wiring,
see wiring instruction kit.
T3
T2
T1
L3
L2
L1
T3
T2
T1
L3
L2
L1
PANEL
GND
(317)
_
+
_
+
HEAT RECOVERY JUNCTION BOX
+
_
/
/
/
/
/
/
/
/
/
/
/
/
/
To UC DI2
Note: Separate grounding is
required if fed from different
transformers. Otherwise a
single ground is acceptable.