![background image](http://html2.mh-extra.com/html/daikin/swp-series/swp-series_installation-manual_5691801007.webp)
Disassembly
1 . Open the fan section access door and remove any item
placed in the section during shipping .
2 . Open the Control Box doors and remove any item placed
during shipping, such as filter clips and isolation pads.
3 . Review the wiring schematics and wiring connections
inside the control box . Disconnect control and
power connections for the supply fan motor and all
compressors . Control wires are plugged into the Patch
Panel on the right side . Disconnect the tubing on PC5,
PC7 and DHL pressure switches .
4 . Disconnect sensor wires from the control box that go out
to the other sections . Place the wire harnesses in the
section where their respective sensor is located .
5 . The top panel of the Control Panel Box should be
removed to allow two eye bolts with nuts to be installed
and used for rigging . Connect the lifting hooks to the eye
bolts and lift to secure the clamps and provide support
to the Control Box in transition . Remove the steel plates’
screws (
Figure 5
); close the panel doors and lift carefully
to remove the section completely (See
Figure 7
) .
NOTE:
To remove panels, flat or right angle painted plates;
T-30 TORX drive is required .
Figure 5: Painted Steel Plates
Figure 6: Assembled Self-Contained Unit Showing Steel Plate Locations and Type
Flat Plate
Right Angle Plate
See
Figure 5
1) Flat Plate
2) Right Angle Plate
1
1
1
2
2
2
2
2
I
nsTallaTIon
www .DaikinApplied .com
7
IM 1032-2 • Self-Contained Air Conditioning Systems