SiUS12-928
Outdoor Unit – 3MXS24JVJU / 4MXS32GVJU
Removal Procedure
200
4
Lift up the main PCB.
5
Disconnect the
connectors.
Refer to page 21 for details.
[S51] [S101] : service monitor
PCB
[S10] : terminal board
(transmission)
[HR1] [HR2] : reactor
[AC1] [AC2] : terminal board
(power supply)
[U] [V] [W] : compressor
6
Remove the main PCB.
2. Removal of the reactor
1
Remove the screw.
Step
Procedure
Points
(R10406)
(R10407)
AC1
(brown)
AC2
(blue)
S10
S101
S51
W(blue)
V(yellow)
U(red)
HR2(blue)
HR1(white)
(R10408)
(R10409)
Reactor
Summary of Contents for SUPER MULTI NX G Series
Page 1: ...SiUS12 928_A Applied Models Inverter Multi Heat Pump G Series J Series...
Page 7: ...SiUS12 928_A Table of Contents vi...
Page 10: ...SiUS12 928_A 1 List of Functions Part 1 List of Functions 1 Functions 3...
Page 11: ...SiUS12 928_A List of Functions 2...
Page 17: ...SiUS12 928_A Specifications 8...
Page 23: ...SiUS12 928_A Specifications Specifications 14...
Page 25: ...SiUS12 928_A Printed Circuit Board Connector Wiring Diagram 16...
Page 37: ...SiUS12 928_A Function and Control 28...
Page 69: ...SiUS12 928_A Control Specification Function and Control 60...
Page 71: ...SiUS12 928_A Operation Manual 62...
Page 73: ...SiUS12 928_A Duct Free System Operation Manual 64 2 Duct Free System 2 1 Remote Controller...
Page 84: ...Duct Free System SiUS12 928_A 75 Operation Manual...
Page 85: ...SiUS12 928_A Duct Free System Operation Manual 76 2 8 TIMER Operation...
Page 86: ...Duct Free System SiUS12 928_A 77 Operation Manual...
Page 87: ...SiUS12 928_A Duct Free System Operation Manual 78 2 9 Note for Multi System...
Page 88: ...Duct Free System SiUS12 928_A 79 Operation Manual...
Page 97: ...SiUS12 928_A Slim Duct Built In System Operation Manual 88...
Page 99: ...SiUS12 928_A Service Diagnosis 90...
Page 169: ...SiUS12 928_A Removal Procedure 160...
Page 225: ...SiUS12 928_A Trial Operation and Field Settings 216...
Page 235: ...SiUS12 928_A Appendix 226...