background image

RZQG71~140L + RZQSG100~Y1B(9)

Split system air conditioners

4P327537-1 – 2012.08

Installation manual

16

14. Electrical wiring work

14.1. Precautions on electrical wiring work

Use only copper wires.

A main switch or other means for disconnection, having a 
contact separation in all poles, must be incorporated in the fixed 
wiring in accordance with applicable legislation.
Do not turn on the main switch until all the wiring is completed. 

For Y1
Make sure to connect power supply cables in normal phase. If 
connected in reverse phase, the remote controller of the indoor 
unit indicates "

U1

" and the equipment cannot operate. Change 

any two of the three power supply cables (L1, L2, L3) to correct 
phase.
If the contact in the magnetic switch should be forcibly turned on 
while the equipment is inoperative, the compressor will burn out. 
Never try to forcibly turn on the contact.

Never squeeze bundled cables into a unit.

Fix cables so that cables do not make contact with the pipes 
(especially on high pressure side).

Secure the electrical wiring with cable ties as shown in the figure 
in chapter 

"14.2. Connecting power supply and inter-unit wiring" 

on page 16

 so that it does not come in contact with the piping, 

particularly on the high-pressure side.
Make sure no external pressure is applied to the terminal 
connectors.

When installing the earth leakage circuit breaker make sure that 
it is compatible with the inverter (resistant to high frequency 
electrical noise) to avoid unnecessary opening of the earth 
leakage circuit breaker.

As this unit is equipped with an inverter, installing a phase 
advancing capacitor not only will deteriorate power factor 
improvement effect, but also may cause capacitor abnormal 
heating accident due to high-frequency waves. Therefore, never 
install a phase advancing capacitor.

14.2. Connecting power supply and inter-unit wiring

Secure the earth wire to the stop valve attachment plate so that 
it does not slide.

Secure the earth wire to the stop valve attachment plate one 
more time along with the electric wiring and the inter-unit wiring.

Lay the electrical wiring so that the front cover does not rise up 
when doing wiring work and attach the front cover securely.

1

Switch box

2

Stop valve mounting plate

3

Ground

4

Tie-wrap

5

Wiring between units

6

Power supply and ground wiring

1

Power supply wiring and earth wire

2

Wiring between units

When cables are routed from the unit, a protection sleeve for the 
conduits (PG-insertions) can be inserted at the knock-out hole. 

(See figure 7)

1

Wire

2

Bush

3

Nut

4

Frame

5

Hose

A

Inside

B

Outside

When you do not use a wire conduit, be sure to protect the wires 
with vinyl tubes to prevent the edge of the knock-out hole from 
cutting the wires.

Follow the electric wiring diagram for electrical wiring works.

Form the wires and fix the cover firmly so that the cover may be 
fit in properly.

WARNING

All wiring must be performed by an authorized 
electrician.

All components procured on the site and all electric 
construction shall comply with the applicable 
legislation.

DANGER: HIGH VOLTAGE

To avoid electrical shock, make sure to disconnect the 
power supply 1 minute or more before servicing the 
electrical parts. Even after 1 minute, always measure the 
voltage at the terminals of main circuit capacitors or 
electrical parts and, before touching, make sure that those 
voltages are 50 V DC or less.

NOTICE

To persons in charge of electrical wiring work:

Do not operate the unit until the refrigerant piping is 
complete. (Running it before the piping is ready will break 
the compressor.)

DANGER

Before obtaining access to terminal devices, all supply 
circuits must be interrupted.

Be sure to install an earth leakage circuit breaker in 
accordance with applicable legislation. Failure to do 
so may cause electrical shock.

CAUTION

Be sure to install the required fuses or circuit breakers.

1

2

3

3

3

3

4

4

5

5

6

6

V1

Y1

1

2

1

2

1

2

Summary of Contents for SkyAir RZQG100L7V1B

Page 1: ...RZQG71L7V1B RZQG100L7V1B RZQG125L7V1B RZQG140L7V1B RZQG71L7Y1B9 RZQG100L7Y1B RZQG125L7Y1B RZQG140L7Y1B RZQSG100L7V1B RZQSG125L7V1B RZQSG140L7V1B RZQSG100L7Y1B9 RZQSG125L7Y1B9 RZQSG140L7Y1B Split syst...

Page 2: ...A B 1 2 4 5 H1 L3 L2 L3 L4 L2 L3 L3 L4 L5 L6 A C E B D H 1 2 3 1 50 Hz 220 240 V 3N 50 Hz 380 415 V V1 type Y1 type 1 2 4 5 A 1 A 2 100 100 100 100 1 1 2 H1 H1 H1 H2 H2 H2 L1 L1 L1 L1 L2 7 R410A R410...

Page 3: ...com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C 11 Information enligt A och godk nts av B enligt Certifikatet C 12 Merk som det fremkommer i...

Page 4: ...run 18 15 4 Precautions regarding test runs 19 15 5 Failure diagnosis at the moment of first installation 19 16 Wiring diagram 20 Thank you for purchasing this product The original instructions are w...

Page 5: ...at can withstand its weight Insufficient strength may result in the fall of equipment and causing injury Carry out the specified installation work in consideration of strong winds typhoons or earthqua...

Page 6: ...it is advised to foresee a delay of 10 minutes for signalling the alarm in case the alarm temperature is exceeded The unit may stop for several minutes during normal operation for defrosting the unit...

Page 7: ...bother next door neighbours Safe places which can withstand the unit s weight and vibration and where the unit can be installed level Places where there is no possibility of flammable gas or product...

Page 8: ...e outdoor unit In heavy snowfall areas it is very important to select an installation site where the snow will not affect the unit and set the outlet side at a right angle to the direction of the wind...

Page 9: ...outlet space position the units with consideration to the space required for the onsite refrigerant piping work as well Consult your dealer if the work conditions do not match those in the drawings 7...

Page 10: ...llation shall comply with applicable legislation In Europe the EN378 is the application standard that shall be used NOTICE To persons in charge of piping work Be sure to open the stop valve after pipi...

Page 11: ...ze Model 71 100 125 140 Maximum total one way piping length a a Parenthesized figure represents the equivalent length Pair L1 size down 10 m 10 m standard 50 m 70 m 75 m 90 m size up 25 m 35 m 35 m 45...

Page 12: ...ecause using existing piping with deteriorated oil will cause compressor breakdown Put some residual oil of the pipes you want to reuse on a piece of white paper or on the white surface of an oil chec...

Page 13: ...ine it will deteriorate the refrigerant oil 9 3 Stop valve operation Cautions on handling the stop valve Make sure to keep both stop valves open during operation The figure below shows the name of eac...

Page 14: ...to the edge and the surrounding end surfaces to prevent rusting When passing electrical wiring through the knock out holes remove any burrs from the knock out holes and wrap the wiring with protective...

Page 15: ...leaks Use a 2 stage vacuum pump with a non return valve which can evacuate to a gauge pressure of 100 7 kPa 5 Torr absolute 755 mm Hg Connect the vacuum pump to both the service port of the gas stop...

Page 16: ...the leak test and vacuum drying see 11 Leak test and vacuum drying on page 12 This unit requires additional charging of refrigerant according to the length of refrigerant piping connected at the site...

Page 17: ...kg b G2 12 m 6 4 R2 0 6 kg 3 Refrigerant charge amount R R1 R2 0 5 0 6 1 1 kg Example 2 1 G1 L1 5 m G2 L2 L3 L4 17 17 20 54 2 Over 30 m a G1 5 m R1 0 0kg b G1 G2 30 5 54 30 29 6 4 R2 0 9 kg 3 Refrige...

Page 18: ...nding on mode type RZQG71 RZQSG100 125 RZQG100 140 RZQSG140 Model Liquid piping Refrigerant piping length 5 10 m a b a For RZQG units only 3 10 m b For RZQG units only When piping length is less than...

Page 19: ...t wiring Secure the earth wire to the stop valve attachment plate so that it does not slide Secure the earth wire to the stop valve attachment plate one more time along with the electric wiring and th...

Page 20: ...esponsibility of the installer or user of the equipment to ensure by consultation with the distribution network operator if necessary that the equipment is connected only to a supply with a short circ...

Page 21: ...the wiring as mentioned on the wiring diagram Make sure no wiring has been forgotten and that there are no missing phases or reverse phases Is the unit properly grounded Is the wiring between units co...

Page 22: ...tector of this product only works during the initialisation stage after a power reset The reversed phase protection detector is designed to stop the product in case of an abnormality when the product...

Page 23: ...or heat exchanger middle R6T Thermistor liquid R10T Thermistor fin RC V1B Signal receiver circuit S1PH High pressure switch TC V1B Signal transmission circuit V1R IGBT power module V1T V1B Insulated g...

Page 24: ...4P327537 1 2012 08 Copyright 2012 Daikin...

Reviews: