![background image](http://html1.mh-extra.com/html/daikin/skyair-ftq18pavju/skyair-ftq18pavju_operation-manual_2460089007.webp)
English
6
OPERATION PROCEDURE
6.
Read the operation manual that came with
the remote controller.
To protect the unit, turn on the main power
•
switch 6 hours before operation.
If the main power supply is turned off during
•
operation, operation will restart automatically
after the power turns back on again.
Part name and functions
1
2
3
3
4
6
5
2
9
1
7
5
7
8
9
In case of vertical position.
In case of horizontal position.
4
6
8
Airfl ow duct (local procurement)
1.
Power supply wiring and ground wire
2.
through conduit
Refrigerant piping
3.
Drain pipe
4.
Air inlet
5.
Remote controller
6.
Transmission wiring
7.
Connection wire
8.
Air outlet (local procurement)
9.
COOLING, HEATING, AUTOMATIC, FAN,
AND PROGRAM DRY OPERATION
Operate in the following order.
1
OPERATION MODE SELECTOR
Press OPERATION MODE SELECTOR
button several times and select the
OPERATION MODE of your choice as
follows.
COOLING OPERATION
............................“
”
HEATING OPERATION
.............................. “
”
AUTOMATIC OPERATION
.........................“
”
In this operation mode, COOL/HEAT change-
•
over is automatically conducted.
FAN OPERATION
........................................ “
”
DRY OPERATION
....................................... “
”
The function of this program is to decrease the
•
humidity in your room with the minimum tem-
perature decrease.
Micro computer automatically determines
•
TEMPERATURE and FAN SPEED.
This system does not go into operation if the
•
room temperature is below 60°F.
Refer to fi gure 3 on page [1]
01_EN_3P250362-3A.indd 6
01_EN_3P250362-3A.indd 6
3/16/2010 4:24:05 PM
3/16/2010 4:24:05 PM