background image

4 Commissioning

Installation manual

9

AZQS100~14 AZQS100~140B7Y1B
Split system air conditioners
4P385528­1 – 2014.08

Connecting to the
frame

When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.

When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.

a b c

d

e

A B

A

 Inside of the outdoor unit

B

 Outside of the outdoor unit

a

 Wire

b

 Bush

c

 Nut

d

 Frame

e

 Hose

5

Reattach the service cover.

6

Connect an earth leakage circuit breaker and fuse to the power
supply line.

3.6

Finishing the outdoor unit
installation

3.6.1

To finish the outdoor unit installation

1

Insulate and fix the refrigerant piping and interconnection cable
as follows:

f

b

a

e

d

c

a

Gas pipe

b

Gas pipe insulation

c

Interconnection cable

d

Liquid pipe

e

Liquid pipe insulation

f

Finishing tape

2

Install the service cover.

3.6.2

To check the insulation resistance of the
compressor

NOTICE

If,  after  installation,  refrigerant  accumulates  in  the
compressor,  the  insulation  resistance  over  the  poles  can
drop,  but  if  it  is  at  least  1  MΩ,  then  the  unit  will  not  break
down.

▪ Use a 500 V mega­tester when measuring insulation.

▪ Do not use a mega­tester for low­voltage circuits.

1

Measure the insulation resistance over the poles.

If

Then

≥1 MΩ

Insulation resistance is OK. This procedure
is finished.

<1 MΩ

Insulation resistance is not OK. Go to the
next step.

2

Turn ON the power and leave it on for 6 hours.

Result: 

The  compressor  will  heat  up  and  evaporate  any

refrigerant in the compressor.

3

Measure the insulation resistance again.

4

Commissioning

NOTICE

NEVER  operate  the  unit  without  thermistors  and/or
pressure  sensors/switches.  Burning  of  the  compressor
might result.

4.1

Checklist before test run

Do NOT operate the system before the following checks are OK:

The 

indoor units

 are properly mounted.

In case a wireless user interface is used: The 

indoor unit

decoration panel

 with infrared receiver is installed.

The 

outdoor unit

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between the outdoor unit and the indoor unit

There are NO 

missing phases

 or 

reversed phases

.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed  according  to  this  document,  and  have  not  been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Summary of Contents for Siesta

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners AZQS100B8V1B AZQS125B8V1B AZQS140B8V1B AZQS100B7Y1B AZQS125B7Y1B AZQS140B7Y1B...

Page 2: ...iivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja liet...

Page 3: ...tdoor unit installation 9 3 6 1 To finish the outdoor unit installation 9 3 6 2 To check the insulation resistance of the compressor 9 4 Commissioning 9 4 1 Checklist before test run 9 4 2 To perform...

Page 4: ...ake sure that condensation water can be evacuated properly INFORMATION If necessary you can use a drain plug kit field supply to prevent drain water from dripping NOTICE If drain holes of the outdoor...

Page 5: ...piping a and the gas piping b Wind heat insulation around the curves and then cover it with vinyl tape c Make sure the field piping does not touch any compressor components d Seal the insulation ends...

Page 6: ...surize to 3000 kPa 30 bar in order to detect small leaks 2 Check for leaks by applying the bubble test solution to all connections 3 Discharge all nitrogen gas 3 3 3 To perform vacuum drying 1 Vacuum...

Page 7: ...F ELECTROCUTION WARNING ALWAYS use multicore cable for power supply cables CAUTION For use of units in applications with temperature alarm settings it is recommended to foresee a delay of 10 minutes f...

Page 8: ...unit NOTICE Follow the wiring diagram delivered with the unit located at the inside of the service cover Fix the earth wire to the stop valve attachment plate so that it does not slide Make sure the...

Page 9: ...edure is finished 1 M Insulation resistance is not OK Go to the next step 2 Turn ON the power and leave it on for 6 hours Result The compressor will heat up and evaporate any refrigerant in the compre...

Page 10: ...d switch two of the three electrical wires U4 or UF The inter unit branch wiring is not correct UA The outdoor and indoor unit are incompatible NOTICE The reversed phase protection detector of this pr...

Page 11: ...tor lower fan PS Switching power supply Q1DI Earth leakage circuit breaker field supply R1 R6 Resistor R1T Thermistor air R2T Thermistor discharge R3T Thermistor suction R4T Thermistor heat exchanger...

Page 12: ...4P385528 1 2014 08 Copyright 2014 Daikin 4P385528 1 0000000T...