![background image](http://html2.mh-extra.com/html/daikin/sibe07-618_d/sibe07-618_d_service-manual-field_5691000136.webp)
SiBE07-618_D
126
Trial Operation and Field Settings
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................127
2. Forced Cooling Operation Mode .........................................................128
3. Trial Operation ....................................................................................129
4. Field Settings ......................................................................................130
4.1
When 2 Units are Installed in 1 Room..................................................130
4.2
Facility Setting Switch (cooling at low outdoor temperature)................131
4.3
Jumper and Switch Settings.................................................................131
5. Application of Silicon Grease to a Power Transistor and a
Diode Bridge .......................................................................................132