7-4 Transmission wiring connection procedure

If an excessive force is applied while connecting a cable to the 
terminal block on the PC board, the PC board may be damaged.

CAUTION

• For low-noise operation, it is necessary to install the optional “Exter-

nal control adaptor for outdoor unit”.
For details, see the installation manual attached to the adaptor.

Make sure to observe the restrictions below.  If they are not 
observed, transmission error may occur.

Maximum wiring length: 

3280 ft.

• Never connect 208/230V to the terminal block for the transmission 

wiring. 
Doing so will break the entire system.

• The transmission wiring from the indoor unit must be connected to 

the F1/F2 (TO IN/D UNIT) terminals on the PC board in the outdoor 
unit.

Make sure to use sheathed two-core cables of AWG18-16 in the wir-
ing shown above.

All cables used in the wiring between the units should be pro-
cured on the site.

8.

CHECKS AFTER COMPLETION OF 
WORK

After completing the work, make sure to confirm the following 
items:

1. Connection of drain piping and removal of transportation metal:

Refer to 

“5. CAUTIONS ON INSTALLATION”

2. Connection of power supply wiring and tightening of screws:

Refer to 

“7-3 Power supply wiring connection procedure”

.

3. Connection of transmission wiring and tightening of screws:

Refer to 

“7-4 Transmission wiring connection procedure”

.

4. Freezing connection of refrigerant piping

Refer to 

“6. REFRIGERANT PIPING WORK”

.

5. Piping size and heat insulation:

Refer to 

“6-1 Selection of piping material”

“6-5 Heat insulation

of piping”

.

6. Check of stop valve:

Confirm that the stop valve is open on both the liquid line and gas
line.

7. Record of amount of additional refrigerant:

Record the amount on the label stuck on the back of the front panel.

8. Measurement of insulation in main power circuit:

Use the megatester for 500 V.

Do not use any megatester for low voltage electric circuits except 
230 V. 
(Wiring between the outdoor unit and the indoor unit)

CAUTION

<To piping technician>

• Make sure to open the stop valve after finishing the piping work.

(Operating the air conditioner with the stop valve shut may damage 
the compressor.)

9.

TEST RUN PROCEDURE

A crankcase heater is mounted for smooth startup.  Make sure to 
turn on the power 6 hours before starting operation for supplying 
the power to the crankcase heater.

WARNING

• Make sure to close the front panel before leaving the outdoor 

unit in the power ON status.

• To avoid injury, always make sure that the circuit breaker on 

the power supply panel of the installation is switched off before doing 
any work.

Cautions before turning on the power

Put the insulating cover securely onto the control box.

After turning on the power, check the settings and LED indica-
tors on the PC board (A2P) in the outdoor unit through the 
opening of the insulating cover.

Caution on the wiring length between units

Cautions on the wiring between units

F

1

F

2

F

1

F

2

F1   F2

Terminal block (X2M)

Use the conductor 

of sheathed wire 

(2 wire) (no polarity)

Indoor unit

01_EN_3PN07193-9P.fm  Page 13  Tuesday, June 6, 2017  3:56 PM

Summary of Contents for RZR36PVJU8

Page 1: ...avant l installation Conserver ce manuel port e de main pour r f rence ult rieure Ce manuel doit tre donn au propri taire de l quipement Lea cuidadosamente estas instrucciones antes de instalar Guarde...

Page 2: ...ult in water leakage elec tric shock or fire When installing the unit in a small room take measures to keep the refrigerant concentration from exceeding allowable safety limits Excessive refrigerant l...

Page 3: ...as thinner or gasoline are handled Oper ating the unit in such conditions can cause a fire Take adequate measures to prevent the outdoor unit from being used as a shelter by small animals Small animal...

Page 4: ...whose velocity is 11 mph or more blows to the out door unit from the air outlet side the air flow rate of the outdoor unit is reduced the outlet air is sucked again short circuit and the following eff...

Page 5: ...conduit and servicing between the units A When an obstruction is present on the air inlet side When the upward area is open 1 When one outdoor unit is installed individually When an obstruction is pr...

Page 6: ...utdoor unit is installed individually The dimensional relationship between H L and A is as shown in the table below NOTE Close the area under the frame so that the outlet air does not bypass there 2 W...

Page 7: ...2 Only two outdoor units can be installed side by side D When outdoor units are stacked 1 When an obstruction is present on the air outlet side NOTE 1 Only two outdoor units can be stacked 2 About 4 i...

Page 8: ...ng nut 3 Remove the transportation metal and the washer as shown in the above figure 4 Return and tighten the fixing nut again 5 Return the sound proof cover to achieve the former status CAUTION If th...

Page 9: ...than the specified refrigerant enter the refrigerant system Do not let any gas such as air enter the refrigerant system Precautions when connecting the piping See the following table for flare dimens...

Page 10: ...nditioner at 14 6 psi or less for 1 hour or more and confirm that the vacuum pressure indi cated by the vacuum gage does not increase If the vacuum pressure increases the system may contain moisture o...

Page 11: ...counterclockwise 2 When the valve stem cannot be turned any more stop turning Now the valve is open How to close the stop valve 1 Insert a hexagon wrench into the valve stem and turn the valve stem c...

Page 12: ...supply wiring and transmission wiring Let the power supply wiring and transmission wiring with a conduit pass through one of the knockout holes on the front or side piping cover and let the transmiss...

Page 13: ...e below for tightening torque for the terminal screws Model Phase and frequency Voltage Max Overcurrent Protective device Min Circuit Amps RZQ30PVJU7 1 60Hz 208 230V 30A 27A RZQ36PVJU8 RZR36PVJU8 RZQ4...

Page 14: ...ORK 5 Piping size and heat insulation Refer to 6 1 Selection of piping material 6 5 Heat insulation of piping 6 Check of stop valve Confirm that the stop valve is open on both the liquid line and gas...

Page 15: ...outdoor unit may continue to operate for a further 3 minutes If the system has not undergone the check operation by the test run button since it was first installed a malfunction code U3 is dis playe...

Page 16: ...in the outdoor unit remain closed Open the stop valve on both the gas and liquid lines The refrigerant is overcharged Calculate again the required amount of refrigerant to be charged based on the pipi...

Page 17: ...ions in steps 1 and 2 above 4 Deal with the situations where the result exceeds the maximum con centration level Where the installation of a facility results in a concentration in excess of the maximu...

Page 18: ...1707 HT 3PN07193 9P EM17A016 00_CV_3PN07193 9P fm Page 2 Tuesday June 6 2017 3 52 PM...

Reviews: