![background image](http://html1.mh-extra.com/html/daikin/rzqg71l8y1l/rzqg71l8y1l_installation-manual_4705447009.webp)
4 Installation
Installation manual
9
RZQG7 RZQG71~12 RZQG140L7Y1L
Split system air conditioners
4P473073-1 – 2017.03
4
Route the wiring through the frame and connect it to it.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a
Power supply cable
b
Interconnection cable
Connecting to the
frame
When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
a b c
d
e
A B
A
Inside of the outdoor unit
B
Outside of the outdoor unit
a
Wire
b
Bush
c
Nut
d
Frame
e
Hose
5
Reattach the service cover.
6
Connect an earth leakage circuit breaker and fuse to the power
supply line.
4.6
Finishing the outdoor unit
installation
4.6.1
To finish the outdoor unit installation
1
Insulate and fix the refrigerant piping and interconnection cable
as follows:
f
b
a
e
d
c
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2
Install the service cover.
4.6.2
To check the insulation resistance of the
compressor
NOTICE
If, after installation, refrigerant accumulates in the
compressor, the insulation resistance over the poles can
drop, but if it is at least 1 MΩ, then the unit will not break
down.
▪ Use a 500 V mega-tester when measuring insulation.
▪ Do not use a mega-tester for low-voltage circuits.
1
Measure the insulation resistance over the poles.
If
Then
≥1 MΩ
Insulation resistance is OK. This procedure
is finished.
<1 MΩ
Insulation resistance is not OK. Go to the
next step.
2
Turn ON the power and leave it on for 6 hours.
Result:
The compressor will heat up and evaporate any
refrigerant in the compressor.
3
Measure the insulation resistance again.