background image

5 Commissioning

Installation manual

16

RZASG71~Y1

Sky Air Advance-series

4P485928-1 – 2017.04

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between the outdoor unit and the indoor unit (master)

▪ Between the indoor units

There are NO 

missing phases

 or 

reversed phases

.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed  according  to  this  document,  and  have  not  been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

5.2

To perform a test run

This task is only applicable when using the BRC1E52 user interface.

▪ When  using  BRC1E51,  see  the  installation  manual  of  the  user

interface.

▪ When using BRC1D, see the service manual of the user interface.

NOTICE

Do not interrupt the test run.

INFORMATION

Backlight.

  To  perform  an  ON/OFF  action  on  the  user

interface,  the  backlight  does  not  need  to  be  lit.  For  any
other  action,  it  needs  to  be  lit  first.  The  backlight  is  lit  for
±30 seconds when you press a button.

1

Perform introductory steps.

#

Action

1

Open the liquid stop valve (A) and gas stop valve (B)
by removing the stem cap and turning
counterclockwise with a hex wrench until it stops.

A

B

2

Close the service cover to prevent electric shocks.

3

Turn ON power for at least 6 hours before starting
operation to protect the compressor.

4

On the user interface, set the unit to cooling operation
mode.

2

Start the test run.

#

Action

Result

1

Go to the home menu.

Cool

Set to

28

°C

2

Press at least 4 seconds.

The Service Settings menu
is displayed.

3

Select Test Operation.

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact

Field Settings

Demand

Min Setpoints Differential

Group Address

4

Press.

Test Operation is
displayed on the home
menu.

Cool

Return

Setting

Test Operation

5

Press within 10 seconds.

Test run starts.

3

Check operation for 3 minutes.

4

Check operation of the airflow direction.

#

Action

Result

1

Press.

Return 

Setting 

Return

Setting

Air Volume/direction

Air Volume

Direction

Position 0

Low

2

Select Position 0.

Return 

Setting 

Return

Setting

Air Volume/direction

Air Volume

Direction

Low

Position 0

3

Change the position.

If the airflow flap of the
indoor unit moves,
operation is OK.

If not, operation is not OK.

4

Press.

The home menu is
displayed.

5

Stop the test run.

#

Action

Result

1

Press at least 4 seconds.

The Service Settings menu
is displayed.

2

Select Test Operation.

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact

Field Settings

Demand

Min Setpoints Differential

Group Address

Summary of Contents for RZASG71M2V1B

Page 1: ...Installation manual Sky Air Advance series English Installation manual Sky Air Advance series RZASG71M2V1B RZASG100M7V1B RZASG125M7V1B RZASG140M7V1B RZASG100M7Y1B RZASG125M7Y1B RZASG140M7Y1B...

Page 2: ...A B C 250 300 1000 A B C E 250 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 HD HU 250 1500 HU HD HU 300 1500 B D E HB HD HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 500 HB HU HB H...

Page 3: ...difi es Richtlijnen zoals geamendeerd Directivas seg n lo enmendado Direttive come da modifica Directivas conforme altera o em 10 11 12 13 14 15 16 17 Direktiver med senere ndringer Direktiv med f ret...

Page 4: ...astaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota T...

Page 5: ...ltera o em 10 11 12 13 14 15 16 17 Direktiver med senere ndringer Direktiv med f retagna ndringar Direktiver med foretatte endringer Direktiivej sellaisina kuin ne ovat muutettuina v platn m zn n Smje...

Page 6: ...PS vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplo...

Page 7: ...To check the insulation resistance of the compressor 15 5 Commissioning 15 5 1 Checklist before commissioning 15 5 2 To perform a test run 16 5 3 Error codes when performing a test run 17 6 Disposal...

Page 8: ...mm 150 6 2 0 350 3 4 5 3 5 5 4 M12 a a Make sure not to cover the drain holes of the bottom plate of the unit INFORMATION The recommended height of the upper protruding part of the bolts is 20 mm 20 N...

Page 9: ...ce cover a with screw b Remove the piping intake plate c with screw d c a b d 2 Choose a piping route a b c or d a b c d 3 If you have chosen the downwards piping route Drill a 4 and remove the knocko...

Page 10: ...at least 200 kPa 2 bar It is recommended to pressurize to 3000 kPa 30 bar in order to detect small leaks 2 Check for leaks by applying the bubble test solution to all connections 3 Discharge all nitr...

Page 11: ...ying or recharging activate field setting vacuum mode After finishing vacuum drying or recharging deactivate field setting vacuum mode WARNING Some sections of the refrigerant circuit may be isolated...

Page 12: ...140 b Only for RZASG100 125 2 Determine the additional refrigerant amount R R1 R2 Examples Layout Additional refrigerant amount R L2 7 m 6 4 mm L3 5 m 6 4 mm L1 35 m 9 5 mm RZASG100 Case Twin standard...

Page 13: ...deactivate the vacuum mode field setting on page 12 2 Connect the refrigerant cylinder to the service port of the liquid stop valve 3 Open the liquid stop valve 4 Charge the complete refrigerant amou...

Page 14: ...connect the electrical wiring on the outdoor unit NOTICE Follow the wiring diagram delivered with the unit located at the inside of the service cover Make sure the electrical wiring does NOT obstruct...

Page 15: ...nsulation resistance of the compressor NOTICE If after installation refrigerant accumulates in the compressor the insulation resistance over the poles can drop but if it is at least 1 M then the unit...

Page 16: ...lit For any other action it needs to be lit first The backlight is lit for 30 seconds when you press a button 1 Perform introductory steps Action 1 Open the liquid stop valve A and gas stop valve B b...

Page 17: ...f the three electrical wires L4 The air inlet or air outlet is blocked U0 The stop valves are closed U2 There is a voltage imbalance There is a missing phase in case of three phase power supply units...

Page 18: ...acles walls baffle plates E Obstacle roof a b c d e Minimum service space between the unit and obstacles A B C D and E eB Maximum distance between the unit and the edge of obstacle E in the direction...

Page 19: ...for See note See note Outdoor Outdoor Indoor Indoor Upper Upper Lower Lower Fan Fan ON ON OFF OFF 2 Layout English Translation Layout Layout Front Front Back Back Position of compressor terminal Posi...

Page 20: ...Earth leakage circuit breaker 30 mA Q1E Overload protection R1 R8 A1P Y1 only Resistor R1T Thermistor air R2T Thermistor discharge R3T Thermistor suction R4T Thermistor heat exchanger R5T Thermistor...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ...4P485928 1 2017 04 Copyright 2017 Daikin 4P485928 1 0000000Y...

Reviews: