background image

3

English

Outdoor Unit Installation Drawings

Precautions on Installation

• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or noise after installed.
• In accordance with the foundation drawing, fix the unit securely by means of the foundation bolts. (Prepare four sets of M8 or M10 

foundation bolts, nuts and washers each which are available on the market.)

• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.

Max. allowable height

Min. allowable length

Max. allowable length

30m

1.5m

20m

Liquid pipe

Gas pipe

O.D.  6.4mm

O.D. 15.9mm

20g/m

Additional refrigerant 
required for refrigerant 
pipe exceeding 10m 
in length.

*

 Be sure to add the proper amount of additional refrigerant.

   Failure to do so may result in reduced performance.

The suggested shortest pipe length is 1.5 m, in order to avoid 

noise from the outdoor unit and vibration. 

(Mechanical noise and vibration may occur depending on how 

the unit is installed and the environment in which it is used.)

25cm from w

all

Right side plate

35cm

(F

oot bolt-hole 

 centres)

(Foot bolt-hole centres)

62cm

**

**

*

CAUTION

** Set the piping length 

from 1.5m to 30m.

Wrap the insulation 
pipe with the finishing 
tape from bottom to top.

Allow space for piping 
and electrical servicing.

Allow 30cm of work 
space below the 
ceiling surface.

If there is the danger of the unit falling 
or overturning, fix the unit with 
foundation bolts, or with wire or other 
means.

If the location does not have good 
drainage, place the unit on a level 
mounting base (or a plastic pedestal). 
Install the outdoor unit in a level 
position. Failure to do so may result in 
water leakage or accumulation.

Level mounting base 
(available separately)

Clamping material

Insulation tube

Service lid

Tape

Also insulate the connection on the outdoor unit.

Use tape or insulating material on all connections 
to prevent air from getting in between the copper 
piping and the insulation tube.
Be sure to do this if the outdoor unit is installed 
above.

20

01_EN_3P188780-1J.fm  Page 3  Tuesday, December 1, 2009  4:19 PM

Summary of Contents for RXS71FV1B

Page 1: ...r R410A Split serisi Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instala...

Page 2: ...2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64526 7F Shinri Sada Manager Quality Control Department 25th of Nov 2009 DAIKIN TCF 015 M18 11 2009 RXS71FV1B RKS71FV1B RXS71FAV1B RKS71FAV1B R...

Page 3: ...rs over the wires Incomplete cover installation may cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigeran...

Page 4: ...wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place...

Page 5: ...noise and vibration may occur depending on how the unit is installed and the environment in which it is used 25cm from wall Right side plate 35cm Foot bolt hole centres Foot bolt hole centres 62cm CAU...

Page 6: ...le Drain socket A into drain hole I and drain caps B into drain hole II and III After insertion turn them about 40 clockwise NOTE Check that the drain receiver C is correctly engaged with the projecti...

Page 7: ...n tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque...

Page 8: ...alve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and m...

Page 9: ...low Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe ther mal insulation O D 15 9mm O D 6 4mm I D 16 20mm I D 8 1...

Page 10: ...ere there is a human 1 You can expand the operation range to 15 C by turning on switch B SW4 on the PCB If the outdoor temperature falls to 20 C or lower the operation will stop If the outdoor tempera...

Page 11: ...mits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase Observe the notes mentioned following when wiring to the power suppl...

Page 12: ...tion the unit disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts such as lo...

Page 13: ...1002 HT 3P188780 1J M06B071J Two dimensional bar code is a code for manufacturing 00_CV_3P188780 1J fm Page 2 Tuesday November 17 2009 1 15 PM...

Reviews: