background image

English

4

Installation Guidelines

• Where a wall or other obstacle is in the path of outdoor unit’s intake or exhaust airflow, follow the installation guidelines below.
• For any of the below installation patterns, the wall height on the exhaust side should be 1200mm or less.

Outdoor Unit Installation

1.

Installing Outdoor Unit

1) When installing the outdoor unit, refer to “Precautions for Selecting the Location” and the “Outdoor Unit Installation Drawings”.
2) If drain work is necessary, follow the procedures below.

2.

Drain Work

• Use drain plug for drainage.
• If the drain port is covered by a mounting base or floor surface, place additional foot bases of at least 100mm in height under the outdoor unit’s feet.
• In cold areas, do not use a drain hose with the outdoor unit.  (Otherwise, drain water may freeze, impairing heating performance.)

1) Insert drain receiver (C) onto drain socket (A) and drain cap (B) beyond 

4 projections around drain socket and drain cap. 

2) Insert drain socket and drain caps into their matching drain hole ; Drain socket 

(A) into drain hole 

I

 and drain caps (B) into drain hole 

II

 and 

III

. After insertion, 

turn them about 40

°

 clockwise.

NOTE

Check that the drain receiver (C) is correctly engaged with the projections of the 
drain socket (A) and drain cap (B). Otherwise, water leakage may result. 

3) Connect vinyl hose on the market (intemal diameter of 25mm) to drain 

socket (A). 
(If the house is too long and hangs down, fix it carefully to prevent the 
kinks.)

4) Make sure that there is no water leakage from portion 

I

II

, or 

III

.

NOTE

If the drain holes of the outdoor unit are covered with the mounting bracket or the floor, raise the unit to provide the space of more 
than 100mm under the leg of the outdoor unit.

More than 100

More than 350

Side view

1200
or less

More than 50

More than 50

More than 350

Top view

More 
than 100

Top view

Unit: mm

More than 100

More than 350

More than 50

Wall facing one side

Walls facing two sides

Walls facing three sides

Projections

Projections

(C) Drain receiver

(A) Drain socket

(B) Drain cap

I

II

III

(Be sure not to insert them into wrong drain holes,
or there causes water leakage.)

(View from bottom)

Projections 
(4 points)

Projections 
(4 points)

01_EN_3P188780-1J.fm  Page 4  Tuesday, December 1, 2009  4:19 PM

Summary of Contents for RXS71FV1B

Page 1: ...r R410A Split serisi Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instala...

Page 2: ...2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64526 7F Shinri Sada Manager Quality Control Department 25th of Nov 2009 DAIKIN TCF 015 M18 11 2009 RXS71FV1B RKS71FV1B RXS71FAV1B RKS71FAV1B R...

Page 3: ...rs over the wires Incomplete cover installation may cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigeran...

Page 4: ...wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place...

Page 5: ...noise and vibration may occur depending on how the unit is installed and the environment in which it is used 25cm from wall Right side plate 35cm Foot bolt hole centres Foot bolt hole centres 62cm CAU...

Page 6: ...le Drain socket A into drain hole I and drain caps B into drain hole II and III After insertion turn them about 40 clockwise NOTE Check that the drain receiver C is correctly engaged with the projecti...

Page 7: ...n tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque...

Page 8: ...alve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and m...

Page 9: ...low Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe ther mal insulation O D 15 9mm O D 6 4mm I D 16 20mm I D 8 1...

Page 10: ...ere there is a human 1 You can expand the operation range to 15 C by turning on switch B SW4 on the PCB If the outdoor temperature falls to 20 C or lower the operation will stop If the outdoor tempera...

Page 11: ...mits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase Observe the notes mentioned following when wiring to the power suppl...

Page 12: ...tion the unit disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts such as lo...

Page 13: ...1002 HT 3P188780 1J M06B071J Two dimensional bar code is a code for manufacturing 00_CV_3P188780 1J fm Page 2 Tuesday November 17 2009 1 15 PM...

Reviews: