background image

5

English

Outdoor Unit Installation

3.

Flaring the Pipe End

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing down-

ward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

WARNING

1) Do not use mineral oil on flared part.
2) Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
3) Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
4) Do never install a drier to this R410A unit in order to guarantee its lifetime.
5) The drying material may dissolve and damage the system.
6) Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant Piping

CAUTION

1) Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
2) To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
3) Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand.  Then tighten them fully with the torque 
wrenches.

(Cut exactly at 

right angles.)

 Remove burrs

Set exactly at the position shown below.

A

Flaring

Die

Check

Flare’s inner 
surface must 
be flaw-free.

The pipe end must 
be evenly flared in 
a perfect circle.

Make sure that the 
flare nut is fitted.

A

0 ~ 0.5mm

Clutch-type

Flare tool for R410A

1.0 ~ 1.5mm

Clutch-type (Rigid-type)

1.5 ~ 2.0mm

Wing-nut type (Imperial-type)

Conventional flare tool

Flare nut tightening torque

Service port cap 

tightening torque

10.8~14.7N • m

(110~150kgf • cm)

Gas side

5/8 inch

61.8~75.4N • m

(630~770kgf • cm)

Liquid side

1/4 inch

14.2~17.2N • m

(144~175kgf • cm)

Valve cap tightening torque

Gas side

5/8 inch

48.1~59.7N • m

(490~610kgf • cm)

Liquid side

1/4 inch

21.6~27.4N • m

(220~280kgf • cm)

Torque wrench

Piping union

Flare nut

Do not apply refrigeration 

oil to the outer surface.

Flare nut

Apply refrigeration oil to 

the inner surface of the 

flare.

Do not apply refrigeration 

oil to the flare nut avoid 

tightening with over torque.

Spanner

[Apply oil]

[Tighten]

01_EN_3P188780-1J.fm  Page 5  Tuesday, December 1, 2009  4:19 PM

Summary of Contents for RXS71FV1B

Page 1: ...r R410A Split serisi Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Manual de instala...

Page 2: ...2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64526 7F Shinri Sada Manager Quality Control Department 25th of Nov 2009 DAIKIN TCF 015 M18 11 2009 RXS71FV1B RKS71FV1B RXS71FAV1B RKS71FAV1B R...

Page 3: ...rs over the wires Incomplete cover installation may cause terminal overheating electrical shock or fire If any refrigerant has leaked out during the installation work ventilate the room The refrigeran...

Page 4: ...wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place...

Page 5: ...noise and vibration may occur depending on how the unit is installed and the environment in which it is used 25cm from wall Right side plate 35cm Foot bolt hole centres Foot bolt hole centres 62cm CAU...

Page 6: ...le Drain socket A into drain hole I and drain caps B into drain hole II and III After insertion turn them about 40 clockwise NOTE Check that the drain receiver C is correctly engaged with the projecti...

Page 7: ...n tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque...

Page 8: ...alve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and m...

Page 9: ...low Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe ther mal insulation O D 15 9mm O D 6 4mm I D 16 20mm I D 8 1...

Page 10: ...ere there is a human 1 You can expand the operation range to 15 C by turning on switch B SW4 on the PCB If the outdoor temperature falls to 20 C or lower the operation will stop If the outdoor tempera...

Page 11: ...mits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase Observe the notes mentioned following when wiring to the power suppl...

Page 12: ...tion the unit disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts such as lo...

Page 13: ...1002 HT 3P188780 1J M06B071J Two dimensional bar code is a code for manufacturing 00_CV_3P188780 1J fm Page 2 Tuesday November 17 2009 1 15 PM...

Reviews: